HEURISTIC ALGORITHM FOR THE TOOL MOVEMENT POLICY IN FLEXIBLE MANUFACTURING SYSTEMS

被引:15
|
作者
SONG, CY
HWANG, H
KIM, YD
机构
[1] Korea Advanced Institute of Science and Technology, Daejon
关键词
FLEXIBLE MANUFACTURING SYSTEMS; LOADING AND SCHEDULING; SCHEDULING AND SEQUENCING TECHNIQUES; HEURISTIC METHODS;
D O I
10.1016/0278-6125(95)98884-9
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider the tool loading problem in flexible manufacturing systems (FMSs) in which each part visits only one machine for its entire process. In these FMSs, if a machine does not have on its tool magazine the tools needed for a part assigned to it, it can borrow tools from other machine(s) or a tool crib or use alternative tools. The problem is to assign parts and tools to machines to minimize the number of tool transfers among machines. A heuristic solution is developed considering similarity among parts. The heuristic is compared with an optimal solution (for small-sized problems) and with an existing heuristic (for medium to large-sized problems). Also presented are computational results that show the effects of two tool redundancy policies (using alternative tools and using multiple tools for each tool type) on system performance.
引用
收藏
页码:160 / 168
页数:9
相关论文
共 50 条
  • [41] Tool-provisioning strategies for flexible manufacturing systems
    DeSouza, R
    ROBOTICS AND COMPUTER-INTEGRATED MANUFACTURING, 1997, 13 (01) : 31 - 39
  • [42] CONTROL RULES FOR TOOL SHARING IN FLEXIBLE MANUFACTURING SYSTEMS
    KASHYAP, AS
    KHATOR, SK
    COMPUTERS & INDUSTRIAL ENGINEERING, 1993, 25 (1-4) : 507 - 510
  • [43] Suboptimal deadlock control policy for flexible manufacturing systems
    Zhu, Sen
    Zhou, Gang
    Li, Zhi-Wu
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1908 - 1913
  • [44] A new cyclic scheduling algorithm for flexible manufacturing systems
    Korbaa, O
    Camus, H
    Gentina, JC
    INTERNATIONAL JOURNAL OF FLEXIBLE MANUFACTURING SYSTEMS, 2002, 14 (02): : 177 - 191
  • [45] A New Cyclic Scheduling Algorithm for Flexible Manufacturing Systems
    Ouajdi Korbaa
    Hervé Camus
    Jean-Claude Gentina
    International Journal of Flexible Manufacturing Systems, 2002, 14 (2): : 173 - 187
  • [46] A Branch and Bound Algorithm for Scheduling of Flexible Manufacturing Systems
    Ahn, Jeongsun
    Kim, Hyun-Jung
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2024, 21 (03) : 4382 - 4396
  • [47] A DECISION SUPPORT ALGORITHM FOR FLEXIBLE MANUFACTURING SYSTEMS CONTROL
    CAPKOVIC, F
    COMPUTERS IN INDUSTRY, 1988, 10 (03) : 165 - 170
  • [48] Evaluation of meta-heuristic approaches for scheduling optimisation of flexible manufacturing systems
    Saravanan, M.
    Haq, A. Noorul
    INTERNATIONAL JOURNAL OF COMPUTER APPLICATIONS IN TECHNOLOGY, 2011, 42 (2-3) : 150 - 158
  • [49] Technical note: tabu search heuristic for a loading problem in flexible manufacturing systems
    Univ of Waikato, Hamilton, New Zealand
    Int J Prod Res, 4 (1171-1174):
  • [50] Hybrid heuristic search for the scheduling of flexible manufacturing systems using Petri nets
    Moro, AR
    Yu, HN
    Kelleher, G
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2002, 18 (02): : 240 - 245