SIMULATION ANALYSIS FOR INTEGRATED EVALUATION OF TECHNICAL AND COMMERCIAL RISK

被引:2
|
作者
GUTLEBER, DS
HEIBERGER, EM
MORRIS, TD
机构
来源
JOURNAL OF PETROLEUM TECHNOLOGY | 1995年 / 47卷 / 12期
关键词
D O I
10.2118/30670-PA
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Decisions to invest in oil- and gasfield acquisitions or participating interests often are based on the perceived ability to enhance the economic value of the underlying asset. The realization of value, however, is a function of numerous outcomes that, in combination, may or may not meet economic expectations. Common industry evaluation practice entails estimating most likely reservoir results, development plans and costs, prices, and other factors within an economic framework. The risk of the opportunity is then assessed through sensitivities to key variables, such as rates and reserves or costs, often through multipliers, Such an approach fails to acknowledge explicitly the uncertainties of the project or integrate the variables so that they interact as a system. The lack of understanding of the project volatility becomes more critical when the deal structure is negotiable and could be used to reduce the economic volatility. A multidisciplinary approach integrating reservoir engineering, operations and drilling, and deal structuring with Monte Carlo simulation modeling can overcome weaknesses of deterministic analysis and significantly enhance investment decisions. This paper discusses the use of spreadsheets and Monte Carlo simulation to generate probabilistic outcomes for key technical and economic parameters for ultimate identification of the economic volatility and value of potential deal concepts for a significant opportunity. The approach differs from a simple risk analysis for an individual well by incorporating detailed, full-field simulations that vary the reservoir parameters, capital and operating cost assumptions,and schedules on timing in the framework of various deal structures.
引用
收藏
页码:1062 / 1067
页数:6
相关论文
共 50 条
  • [41] Optimization of Integrated Risk in Commercial Banking Based on Financial Statements
    Bao, Chunbing
    Li, Jianping
    Wu, Dengsheng
    Zhu, Xiaoqian
    Liang, Changzhi
    Liu, Chang
    2ND INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND QUANTITATIVE MANAGEMENT, ITQM 2014, 2014, 31 : 501 - 510
  • [42] Fundamental analysis and technical analysis integrated system for stock filtration
    Eiamkanitchat, Narissara
    Moontuy, Theerasak
    Ramingwong, Sakgasit
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2017, 20 (01): : 883 - 894
  • [43] COMMERCIAL AND TECHNICAL TRENDS
    不详
    DAIRY INDUSTRIES INTERNATIONAL, 1991, 56 (07) : 35 - 36
  • [44] Some technical challenges in modeling and simulation of integrated military communication networks
    Pan, XL
    Feng, SD
    Xu, DY
    ISTM/2005: 6th International Symposium on Test and Measurement, Vols 1-9, Conference Proceedings, 2005, : 8134 - 8137
  • [45] TECHNICAL AND DEMOCRATIC VALUES IN RISK ANALYSIS
    FIORINO, DJ
    RISK ANALYSIS, 1989, 9 (03) : 293 - 299
  • [46] Integrated worker risk evaluation system
    McGinn, W
    Moyer, JH
    Bloom, LD
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2001, : 45 - 51
  • [47] The Technical Inspection of Device for Integrated Evaluation of the Antioxidant Activity of Foods
    Batachenko, Serhiy
    Tomashevskyi, Roman
    2017 IEEE FIRST UKRAINE CONFERENCE ON ELECTRICAL AND COMPUTER ENGINEERING (UKRCON), 2017, : 302 - 305
  • [48] COMMERCIAL AIRPLANE MARKET ANALYSIS BY AIRLINE SIMULATION
    HOWARD, LR
    OPERATIONS RESEARCH, 1966, S 14 : B85 - &
  • [49] Performance simulation of integrated water and power systems -: software tools IPSEpro and RESYSpro for technical, economic and ecological analysis
    Rheinländer, J
    Perz, EW
    Goebel, O
    DESALINATION, 2003, 157 (1-3) : 57 - 64
  • [50] Evaluation of mortality factors and risk analysis for the design of an integrated pest management system
    Roux, O
    Baumgartner, J
    ECOLOGICAL MODELLING, 1998, 109 (01) : 61 - 75