共 50 条
- [32] PROFIT ANALYSIS OF A 2-UNIT COLD STANDBY SYSTEM WITH ABNORMAL WEATHER CONDITION MICROELECTRONICS AND RELIABILITY, 1991, 31 (01): : 1 - 5
- [35] COST-ANALYSIS OF A 2-UNIT STANDBY SYSTEM UNDER THE INFLUENCE OF EARTHQUAKES MICROELECTRONICS AND RELIABILITY, 1994, 34 (04): : 735 - 739
- [36] ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH PREPARATION TIME AND CORRELATED FAILURES AND REPAIRS MICROELECTRONICS AND RELIABILITY, 1995, 35 (08): : 1163 - 1165
- [37] BUSY PERIOD ANALYSIS OF A 2-UNIT WARM STANDBY SYSTEM WITH IMPERFECT SWITCH MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 675 - 679
- [38] PROFIT ANALYSIS OF 2-UNIT PRIORITY STANDBY SYSTEM WITH REST PERIOD OF THE OPERATOR MICROELECTRONICS AND RELIABILITY, 1990, 30 (04): : 649 - 654
- [39] COST-BENEFIT-ANALYSIS OF A 2-UNIT DETERIORATING STANDBY SYSTEM WITH DETECTOR MICROELECTRONICS AND RELIABILITY, 1986, 26 (05): : 863 - 866
- [40] PROFIT ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH 2 TYPES OF REPAIR AND PREVENTIVE MAINTENANCE MICROELECTRONICS AND RELIABILITY, 1986, 26 (03): : 435 - 441