Feasibility study into the replacement or augmentation of the main cables of a long-span suspension bridge

被引:1
|
作者
Colford, B. R. [1 ]
Clark, C. A. [2 ]
机构
[1] Forth Estuary Transport Author, Forth Rd Bridge, South Queensferry, Scotland
[2] WA Fairhurst & Partners, Glasgow, Lanark, Scotland
关键词
suspension bridge; parallel wire cables; cable saddles; cable anchorages;
D O I
10.1080/15732480903142500
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Forth Road Bridge is a long-span suspension bridge with a main span of 1006 m and side spans of some 408 m. Approach viaducts to the north and south bring the total length of the structure to just under 2500 m. The bridge was opened in 1964 and is used by over 24 million vehicles each year. All of the maintenance work on the bridge that requires lane or carriageway closures is carried out overnight or during limited weekend carriageway or lane closures to minimise delays to users on this important strategic and commuter route. During the first internal inspection of the main cables carried out in 2004 (40 years after opening) significant corrosion was found, leading to the retrofitting of acoustic monitoring and a system of dehumidification on the main cables. In addition, a second internal inspection was carried out in 2008 to try to establish the rate of corrosion found in the cables. The inspections and retrofitting works are described elsewhere. This paper deals with a feasibility study to determine if the main cables on Forth Road Bridge could be either replaced or augmented in the event that corrosion continued following the retrofitting of the dehumidification system. Another key area that was examined as part of the study but does not form part of this paper was the long term structural integrity of the cable anchorages.
引用
收藏
页码:119 / 133
页数:15
相关论文
共 50 条
  • [21] Influence of catwalk design parameters on the galloping of constructing main cables in long-span suspension bridges
    Guo, Pan
    Li, Shengli
    Wang, Chaoqun
    Hu, Yanan
    Wang, Dongwei
    JOURNAL OF VIBROENGINEERING, 2017, 19 (06) : 4671 - 4684
  • [22] Research on Optimization of Hoisting Sequence of Main Girder of Asymmetric Long-span Suspension Bridge
    Xiong, Shaohui
    Li, Yang
    Fu, Bin
    IOP Conference Series: Earth and Environmental Science, 2021, 638 (01):
  • [23] Calculation method of main cable system construction control of long-span suspension bridge
    Huang, Pingming
    Mei, Kuihua
    Xu, Yue
    Xi'an Gonglu Xueyuan Xuebao/Journal of Xi'an Highway Transportation University, 2000, 20 (04): : 19 - 22
  • [24] A parametric study of long-span triple-tower suspension bridge
    Jia, Lijun
    Wang, Jinliang
    Jiang, Yang
    Xu, Rong
    ADVANCES IN STRUCTURAL ENGINEERING, 2020, 23 (15) : 3185 - 3194
  • [25] Comparative study of damage indices in application to a long-span suspension bridge
    Wang, BS
    Liang, XB
    Ni, YQ
    Ko, JM
    ADVANCES IN STRUCTURAL DYNAMICS, VOLS I & II, 2000, 10 : 1085 - 1092
  • [26] Study of Influencing Factors of Impact Coefficient of Long-Span Suspension Bridge
    Zhu J.
    Xiang C.
    Qi H.
    Tianjin Daxue Xuebao (Ziran Kexue yu Gongcheng Jishu Ban)/Journal of Tianjin University Science and Technology, 2019, 52 (04): : 413 - 422
  • [27] Nonlinear Flutter Analysis for a Long-Span Suspension Bridge
    Liu, Jieshan
    Wang, Fan
    Yang, Yang
    Liu, Renhuai
    SHOCK AND VIBRATION, 2021, 2021
  • [28] Long-Term In-Service Monitoring and Performance Assessment of the Main Cables of Long-Span Suspension Bridges
    Deng, Yang
    Liu, Yang
    Chen, Suren
    SENSORS, 2017, 17 (06):
  • [29] Influence of Span Arrangement on Stiffness of Long-Span Railway Suspension Bridge
    Su P.-F.
    Hu S.-T.
    Guo H.
    Sun D.-Q.
    Bridge Construction, 2023, 53 (03) : 71 - 78
  • [30] The key quality control technology of main cable erection in long-span suspension bridge construction
    Chen, Yongrui
    Wei, Wei
    Dai, Jie
    3RD INTERNATIONAL CONFERENCE ON ENERGY MATERIALS AND ENVIRONMENT ENGINEERING, 2017, 61