CAPACITATED LOT SIZING WITH SETUP TIMES

被引:264
|
作者
TRIGEIRO, WW
THOMAS, LJ
MCCLAIN, JO
机构
[1] SYST & TECHNOL RES,RESTON,VA 22091
[2] CORNELL UNIV,JOHNSON GRAD SCH MANAGEMENT,ITHACA,NY 14853
关键词
D O I
10.1287/mnsc.35.3.353
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:353 / 366
页数:14
相关论文
共 50 条
  • [21] A SIMPLE HEURISTIC FOR LOT SIZING WITH SETUP TIMES
    TRIGEIRO, WW
    DECISION SCIENCES, 1989, 20 (02) : 294 - 303
  • [22] A hybrid approach for the capacitated lot sizing problem with setup carryover
    Goren, Hacer Guner
    Tunali, Semra
    Jans, Raf
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (06) : 1582 - 1597
  • [23] Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times
    Denizel, Meltem
    Altekin, F. Tevhide
    Sueral, Haldun
    Stadtler, Hartmut
    OR SPECTRUM, 2008, 30 (04) : 773 - 785
  • [24] Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times
    Meltem Denizel
    F. Tevhide Altekin
    Haldun Süral
    Hartmut Stadtler
    OR Spectrum, 2008, 30 : 773 - 785
  • [25] Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories
    Charles, Mehdi
    Dauzere-Peres, Stephane
    Kedad-Sidhoum, Safia
    Mazhoud, Issam
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (01) : 203 - 220
  • [26] An HNP-MP Approach for the Capacitated Multi-Item Lot Sizing Problem With Setup Times
    Wu, Tao
    Shi, Leyuan
    Duffie, Neil A.
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2010, 7 (03) : 500 - 511
  • [27] A FRAMEWORK FOR MODELING SETUP CARRYOVER IN THE CAPACITATED LOT-SIZING PROBLEM
    GOPALAKRISHNAN, M
    MILLER, DM
    SCHMIDT, CP
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1995, 33 (07) : 1973 - 1988
  • [28] Lot-sizing scheduling with batch setup times
    Bo Chen
    Yinyu Ye
    Jiawei Zhang
    Journal of Scheduling, 2006, 9 : 299 - 310
  • [29] Lot-sizing scheduling with batch setup times
    Chen, B
    Ye, YY
    Zhang, JW
    JOURNAL OF SCHEDULING, 2006, 9 (03) : 299 - 310
  • [30] Capacitated Lot-Sizing Problem with Sequence-Dependent Setup, Setup Carryover and Setup Crossover
    Kang, Jangha
    PROCESSES, 2020, 8 (07)