Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa

被引:0
|
作者
Baloyi, Lucius [1 ]
Bekker, Michiel [1 ]
机构
[1] Univ Pretoria, Grad Sch Technol Management, Lynnwood Rd, Pretoria, South Africa
关键词
Project cost performance; schedule delays; cost overruns; project construction;
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
The FIFA World Cup is the largest international sports event in the world. Hosting the FIFA World Cup remains a sought after goal for any country. Due to the magnitude of spectators and scale of participation the hosting of the event requires substantial investment in infrastructure, especially the stadia where the various football games will be played. The award of the 2010 FIFA World Cup to South Africa resulted in ten stadia to be either upgraded or newly constructed for the event in South Africa. Even though all the stadia were ready for the tournament, nearly all projects experienced time delays and cost overruns. This article investigates the reasons or causes of cost overruns and time delays during the upgrading and construction of the various stadia. A three-tier research approach covers a comprehensive literature review on the causes of cost overruns and time delays on construction-related projects globally as well as an investigation into the factors that caused cost overruns and time delays on six of the stadia. Finally, the results for the global and stadia projects are compared. The results indicate that the increase in material cost is the single largest contributor to cost overruns for both global and stadia projects. With respect to time delays the most significant contributing factor for global projects was late delay in payments while for the stadia projects design-related factors caused the most delays. The results provide valuable information on the unique challenges facing those who are interested in investing or managing construction projects in South Africa.
引用
收藏
页码:51 / 67
页数:17
相关论文
共 50 条
  • [21] FIFA World Cup in South Africa 2010: How was this experience and what can we learn with it?
    Marchi Junior, Wanderley
    Bolsmann, Chris
    de Almeida, Barbara Schausteck
    de Souza, Juliano
    MOVIMENTO, 2014, 20 (02) : 711 - 733
  • [22] Americans’ attitudes toward South Africa: A study of country reputation and the 2010 FIFA World Cup
    Jami Fullerton
    Derina Holtzhausen
    Place Branding and Public Diplomacy, 2012, 8 (4) : 269 - 283
  • [23] CONSTRUCTION CLAIMS AND DISPUTES - CAUSES AND COST/TIME OVERRUNS
    SEMPLE, C
    HARTMAN, FT
    JERGEAS, G
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (04): : 785 - 795
  • [24] Theoretical framework of the causes of construction time and cost overruns
    Ullah, K.
    Abdullah, A. H.
    Nagapan, S.
    Suhoo, S.
    Khan, M. S.
    GLOBAL CONGRESS ON CONSTRUCTION, MATERIAL AND STRUCTURAL ENGINEERING 2017 (GCOMSE2017), 2017, 271
  • [25] Construction claims and disputes: causes and cost/time overruns
    Semple, Cheryl
    Hartman, Francis T.
    Jergeas, George
    Journal of Construction Engineering and Management, 1994, 120 (04) : 785 - 795
  • [26] 'Africa's Tournament'? The Branding Legacy of the 2010 FIFA World Cup™
    Allen, Dean
    Knott, Brendon
    Swart, Kamilla
    INTERNATIONAL JOURNAL OF THE HISTORY OF SPORT, 2013, 30 (16): : 1993 - 2006
  • [28] The Rocky Road to Legacy: Lessons from the 2010 FIFA World Cup South Africa Stadium Program
    Molloy, Eamonn
    Chetty, Trish
    PROJECT MANAGEMENT JOURNAL, 2015, 46 (03) : 88 - 107
  • [29] The sex ratio at birth in South Africa increased 9 months after the 2010 FIFA World Cup
    Masukume, Gwinyai
    Grech, Victor
    EARLY HUMAN DEVELOPMENT, 2015, 91 (12) : 807 - 809
  • [30] THE ECONOMIC PREDICTION FOR SPORTS RESULTS: FROM THE BEIJING OLYMPICS TO THE 2010 FIFA WORLD CUP SOUTH AFRICA
    Andreff, Wladimir
    Andreff, Madeleine
    LOGOS, 2013, (05): : 119 - 138