OPTIMAL REPLACEMENT TIMES - A GENERAL SET-UP

被引:45
|
作者
AVEN, T
BERGMAN, B
机构
[1] LINKOPING INST TECHNOL,S-58188 LINKOPING,SWEDEN
[2] UNIV OSLO,OSLO 3,NORWAY
关键词
D O I
10.2307/3214185
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
引用
收藏
页码:432 / 442
页数:11
相关论文
共 50 条
  • [21] The impact of robot set-up times on total operative times for robotic prostatectomy
    Mayer, E.
    Winkler, M.
    Hrouda, D.
    Ogden, C.
    Vale, J.
    Karim, O.
    EUROPEAN UROLOGY SUPPLEMENTS, 2007, 6 (02) : 125 - 125
  • [22] Optimal choice of covariates in the set-up of crossover designs
    Dutta, Ganesh
    SahaRay, Rita
    STATISTICS AND APPLICATIONS, 2013, 11 (1-2): : 93 - 109
  • [23] OPTIMAL INVENTORY POLICY WITH MULTIPLE SET-UP COSTS
    LIPPMAN, SA
    MANAGEMENT SCIENCE SERIES A-THEORY, 1969, 16 (01): : 118 - 138
  • [24] Cement industry hopes for a better general set-up
    不详
    ZKG INTERNATIONAL, 2006, 59 (03): : 20 - 21
  • [25] The flexible blocking job shop with transfer and set-up times
    Heinz Gröflin
    Dinh Nguyen Pham
    Reinhard Bürgy
    Journal of Combinatorial Optimization, 2011, 22 : 121 - 144
  • [26] A heuristic for sequencing PCB assembly to minimize set-up times
    Rajkumar, K
    Narendran, TT
    PRODUCTION PLANNING & CONTROL, 1998, 9 (05) : 465 - 476
  • [27] The flexible blocking job shop with transfer and set-up times
    Groeflin, Heinz
    Dinh Nguyen Pham
    Buergy, Reinhard
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2011, 22 (02) : 121 - 144
  • [28] Optimizing Set-Up Times Using the HeuristicLab Optimization Environment
    Karder, Johannes
    Scheibenpflug, Andreas
    Wagner, Stefan
    Affenzeller, Michael
    COMPUTER AIDED SYSTEMS THEORY - EUROCAST 2015, 2015, 9520 : 286 - 293
  • [29] FLOWSHOP SCHEDULING WITH SET-UP, PROCESSING AND REMOVAL TIMES SEPARATED
    PROUST, C
    GUPTA, JND
    DESCHAMPS, V
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1991, 29 (03) : 479 - 493
  • [30] Completion times in multipurpose batch plants with set-up, transfer and clean-up times.
    Grau, R
    Espuna, A
    Puigjaner, L
    COMPUTERS & CHEMICAL ENGINEERING, 1996, 20 : S1143 - S1148