共 50 条
- [31] DSF-P1 - EMERGENCY CORE COOLING EXPERIMENT FOR BWRS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1975, 20 (APR21): : 494 - 496
- [32] BRITTLE BEHAVIOR OF ZIRCALOY UNDER EMERGENCY-CORE-COOLING CONDITIONS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1969, 12 (01): : 355 - &
- [33] AN ANALYSIS OF A FEED-AND-BLEED MODE OF PWR EMERGENCY CORE COOLING TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1983, 45 : 468 - 469
- [34] LEVEL-SWELL EMERGENCY CORE-COOLING TESTS FOR A PWR TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1974, 19 (OCT27): : 293 - 295
- [35] A METHOD FOR DETERMINING A PERIODIC TEST PROCEDURE FOR THE EMERGENCY CORE COOLING SYSTEM TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1981, 38 (JUN): : 488 - 489
- [36] ANALYSES OF PRECOOLING PARAMETERS FOR WATER-REACTOR EMERGENCY CORE COOLING TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1976, 23 (JUN18): : 285 - 287
- [37] EMERGENCY CORE COOLING CARRYOUT RATE CORRELATION DETERMINED BY NONLINEAR PROGRAMMING TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1972, 15 (02): : 828 - +
- [38] METALLURGICAL EVALUATION OF ZIRCALOY EXPOSED TO EMERGENCY-CORE-COOLING CONDITIONS TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1969, 12 (01): : 356 - &