共 50 条
- [41] Repair efficiency and Life-Cycle Cost of RC bridge deck maintenance subjected to spatially variable corrosion damage APPLICATIONS OF STATISTICS AND PROBABILITY IN CIVIL ENGINEERING, 2011, : 2257 - 2265
- [43] Stress distribution on the real corrosion surface of the orthotropic steel bridge deck STEEL AND COMPOSITE STRUCTURES, 2015, 18 (06): : 1479 - 1492
- [44] Study of time- dependent corrosion influences on the bridge deck resistance STEEL STRUCTURES AND BRIDGES 2012 - 23RD CZECH AND SLOVAK INTERNATIONAL CONFERENCE, 2012, 40 : 475 - 480
- [45] In-situ assessment of corrosion induced damage of the Dickson bridge deck DURABILITY OF BUILDING MATERIALS AND COMPONENTS 8, VOLS 1-4, PROCEEDINGS, 1999, : 269 - 279
- [47] Influence of stay-in-place forms on concrete bridge deck corrosion Balakumaran, Soundar S. G., 1600, American Concrete Institute (111):
- [48] Electrokinetic nanoparticle treatment for corrosion remediation on simulated reinforced bridge deck Journal of Nanoparticle Research, 2013, 15
- [49] Risk-based performance evaluation for concrete bridge deck repair MAINTENANCE, SAFETY, RISK, MANAGEMENT AND LIFE-CYCLE PERFORMANCE OF BRIDGES, 2018, : 1161 - 1168