THE PROBLEMS OF THE SCHEDULING THEORY WITH FUZZY ACTIVITY DURATIONS

被引:0
|
作者
FEIGIN, LI
机构
来源
DOKLADY AKADEMII NAUK SSSR | 1983年 / 272卷 / 04期
关键词
D O I
暂无
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
引用
收藏
页码:812 / 815
页数:4
相关论文
共 50 条
  • [31] Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction
    Yuan, Yisong
    Ye, Sudong
    Lin, Lin
    Gen, Mitsuo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 158
  • [32] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Lamas, Patricio
    Demeulemeester, Erik
    JOURNAL OF SCHEDULING, 2016, 19 (04) : 409 - 428
  • [33] A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations
    Patricio Lamas
    Erik Demeulemeester
    Journal of Scheduling, 2016, 19 : 409 - 428
  • [34] RESILIENCE ANALYSIS FOR PROJECT SCHEDULING WITH RENEWABLE RESOURCE CONSTRAINT AND UNCERTAIN ACTIVITY DURATIONS
    Xiong, Jian
    Chen, Yingwu
    Zhou, Zhongbao
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2016, 12 (02) : 719 - 737
  • [35] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Christian Artigues
    Roel Leus
    Fabrice Talla Nobibon
    Flexible Services and Manufacturing Journal, 2013, 25 : 175 - 205
  • [36] Scheduling with uncertain durations: Modeling β-robust scheduling with constraints
    Wu, Christine Wei
    Brown, Kenneth N.
    Beck, J. Christopher
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (08) : 2348 - 2356
  • [37] Heuristic for network project scheduling with random activity durations depending on the resource allocation
    Ben-Gurion Univ of the Negev, Beer Sheva, Israel
    Int J Prod Econ, 2 (149-162):
  • [38] A heuristic for network project scheduling with random activity durations depending on the resource allocation
    Golenko-Ginzburg, D
    Gonik, A
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1998, 55 (02) : 149 - 162
  • [39] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Artigues, Christian
    Leus, Roel
    Nobibon, Fabrice Talla
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2013, 25 (1-2) : 175 - 205
  • [40] Robust optimization for resource-constrained project scheduling with uncertain activity durations
    Leus, R.
    Artigues, C.
    Nobibon, F. Talla
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 101 - 105