共 50 条
- [42] Design and construction of remedial works for the Standedge canal tunnel TRANSACTIONS OF THE INSTITUTION OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2002, 111 : A106 - A114
- [43] NETHERTON CANAL TUNNEL - RECENT REPAIRS OF FAILED SECTIONS PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1987, 82 : 1231 - 1239
- [44] Design and construction of remedial works for the Standedge canal tunnel Transactions of the Institutions of Mining and Metallurgy, Section A: Mining Technology, 2002, 111 A89-158
- [46] NETHERTON CANAL TUNNEL - RECENT REPAIRS OF FAILED SECTIONS PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1987, 82 (pt 1): : 35 - 58
- [47] Relationship of carpal canal contents volume to carpal canal pressure in carpal tunnel syndrome patients JOURNAL OF HAND SURGERY-BRITISH AND EUROPEAN VOLUME, 2004, 29B (03): : 277 - 280
- [48] The Comparison of Tunnel Engineering Construction Methods ForRenhechang Tunnel Crossing Underneath Existing Tunnel On Lanzhou-Chongqing Railway PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING II, PTS 1-4, 2013, 405-408 : 1330 - 1333
- [49] Three-dimensional Finite Element Study of Tunnel Advancing to Adjacent Perpendicularly Crossing Tunnel Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2021, 48 (07): : 89 - 98
- [50] Construction of the second overpass of the Mittelland Canal crossing the Leine near Hanover Stahlbau, 1998, 67 (05): : 374 - 380