The time of groundwater free surface lowering before foundation pit construction

被引:2
|
作者
Girgidov, A. D. [1 ]
机构
[1] St Petersburg State Polytech Univ, St Petersburg, Russia
来源
MAGAZINE OF CIVIL ENGINEERING | 2012年 / 30卷 / 04期
关键词
groundwater; pit; free surface flow: lowering of free surface; group of wells; time of lowering;
D O I
10.5862/MCE.30.8
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
On the basis of plane free surface gravitations groundwater flow model and some assumptions similar to ones employing in infiltration and quasistationary problems the time of the necessary lowering of free surface before the building of pit is considered. For the lowering the group of wells along the pit perimeter is used. The wells are located so close to each other that formation a filtration flow by them is equivalent to dewatering by using a narrow vertical slit along the perimeter of the excavation. The time is calculated on the basis of condition that at the beginning of construction the level of ground water within the excavation must be below the design elevation of excavation bottom, and outside it smoothly changing water flow to the slit must be formed. The formulas for the time of lowering from initial natural level before building of pit to finite level equal to the bottom of pit are obtained. The example of calculation is discussed.
引用
收藏
页码:52 / +
页数:6
相关论文
共 50 条
  • [31] Metro Station Deformation Caused by Deep Foundation Pit Construction
    Xin, Chunlei
    Gao, Bo
    ADVANCES IN CIVIL AND INDUSTRIAL ENGINEERING IV, 2014, 580-583 : 1061 - 1064
  • [32] Foundation Pit Support Design and Construction of A Complex Building in Changchun
    Xiong, Hui
    He, Longxiang
    Ma, Yufei
    PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 968 - 971
  • [33] Experience of designing and construction of the Chirkey HPP foundation pit (FP)
    Nejkovskij, A.A.
    Sklyarenko, A.V.
    Gidrotekhnicheskoe Stroitel'stvo, 2004, (09): : 39 - 42
  • [34] Stability analysis of free surface of soil between piles in fabricated recyclable foundation pit supporting structure
    Chen L.-C.
    Lin P.-Y.
    Guo C.-C.
    Wang F.-M.
    Guo, Cheng-Chao (guochch25@mail.sysu.edu.cn), 1600, Academia Sinica (41): : 299 - 305
  • [35] Test research on time effect of foundation pit rebound
    Department of Geotechnical Engineering, Tongji University, Shanghai 200092, China
    Yanshilixue Yu Gongcheng Xuebao, 2007, SUPPL. 1 (3040-3044):
  • [36] A new method for slope stability analysis of foundation pit due to groundwater seepage
    Chen, Guoxing
    Li, Chunzhong
    Fan, Youwei
    Soft Soil Engineering, 2007, : 541 - 545
  • [37] STUDY on Quality Control of SMW Construction Pile in Foundation Pit Excavation of Soft Soil Foundation
    Fei, Cheng
    2017 3RD INTERNATIONAL CONFERENCE ON ENERGY, ENVIRONMENT AND MATERIALS SCIENCE (EEMS 2017), 2017, 94
  • [38] Groundwater lowering for construction of the Kilsby Tunnel - geological and geotechnical aspects
    Preene, Martin
    Chrimes, Mike M.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-ENGINEERING HISTORY AND HERITAGE, 2022, 175 (04) : 130 - 144
  • [39] Real-Time Monitoring for Effects of Vibration and Temperature of Construction Site on Steel Assembly Bracing of Foundation Pit
    Yang, Yingwu
    Zeng, Hangbin
    Liu, Xingxi
    Yang, Bo
    Li, Ying
    BUILDINGS, 2023, 13 (02)
  • [40] Study on construction stability of subway foundation pit considering nonlinear contact
    Hou, Shiwei
    Guo, Shaopo
    Ma, Shihe
    NEW ADVANCES IN GEOTECHNICAL ENGINEERING, 2018, : 82 - 87