The Vertical Bearing Mechanism of Hybrid Bored Pre-stressed Concrete Cased Piles

被引:5
|
作者
Mengxiong Tang
Hesong Hu
Jie Cui
Xiaosong Yang
Han Hu
Hang Chen
机构
[1] Guangzhou Institute of Building Science Co. Ltd.,Guangzhou Higher Education Mega Center, School of Civil Engineering
[2] Guangzhou University,undefined
关键词
Hybrid bored pre-stressed concrete cased piles; Grouting; Finite element analysis; Cohesive elements; Modulus attenuation;
D O I
暂无
中图分类号
学科分类号
摘要
Finite element analysis (FEA) models for sophisticated hybrid bored pre-stressed concrete cased piles, where the unique grouted interface between the pile and strata is highlighted by cohesive elements, are established in this paper and their applicability is demonstrated by comparing the in situ experiments and FEA simulations. The underlying bearing mechanism is investigated from the aspects of energy dissipation due to the damage of the grouted interface, the axial force along the pile length, and the deformation evolution in the surrounding strata. Under the failure criteria controlled by both the stiffness of the pile/soil system and pile head allowable settlement, the ultimate bearing capacity increases with the interfacial shear strength until reaching an asymptotic value. By energy analysis, it is demonstrated that the buffering effect of the strata to redistribute the stresses in the system is another key factor for the bearing capacity and failure mode of the pile foundations. The decrease in modulus attenuation (from approximately 90% to 50% in the studied case) leads to a larger asymptotic bearing capacity (from approximately 2.17 × 104 to 2.88 × 104 kN in the studied case, respectively) if the ductile failure mode of the pile foundations is guaranteed. However, the minimum interfacial strength needed for the presence of the preferred ductile failure mode is also increased (from 0.6 to 2.0 MPa in the studied case), which indicates more rigorous conditions for the grouting of pile/soil gap. As improved grouting quality and less modulus attenuation are commonly contradictory to each other from the aspects of construction practice, it is suggested that, if the grouting quality cannot be guaranteed, optimizations should be carefully carried out to achieve the presence of the preferred ductile failure mode of the pile foundations.
引用
收藏
页码:293 / 302
页数:9
相关论文
共 50 条
  • [1] The Vertical Bearing Mechanism of Hybrid Bored Pre-stressed Concrete Cased Piles
    Tang, Mengxiong
    Hu, Hesong
    Cui, Jie
    Yang, Xiaosong
    Hu, Han
    Chen, Hang
    INTERNATIONAL JOURNAL OF CIVIL ENGINEERING, 2020, 18 (3A) : 293 - 302
  • [2] Vertical load bearing behavior of bored pre-cast concrete piles
    Tanahashi, H
    DEEP FOUNDATIONS ON BORED AND AUGER PILES - BAP III, 1998, : 253 - 260
  • [3] Hybrid Bored Prestressed Concrete Cased Piles: Equipment and Construction Procedures
    Chen, Hang
    Hu, Hesong
    Tang, Mengxiong
    Yang, Xiaosong
    Zhu, Jianxin
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (12)
  • [4] PERFORMANCE OF DRIVEN PRE-STRESSED CONCRETE PILES.
    Evans, G.L.
    Hong Kong engineer, 1987, 15 (03): : 9 - 14
  • [5] Flexural performances of pre-stressed concrete piles reinforced with hybrid BFRP and steel bars
    Wu, Ping
    Guo, Yang
    Zhu, Dayong
    Jin, Weiliang
    Lee, Chack-fan
    EUROPEAN JOURNAL OF ENVIRONMENTAL AND CIVIL ENGINEERING, 2022, 26 (04) : 1433 - 1452
  • [6] PRE-STRESSED CONCRETE
    不详
    NATURE, 1949, 163 (4143) : 472 - 473
  • [7] Physical model tests on bearing performance drilling with pre-stressed concrete pipe cased pile considering hole collapse
    Hou Z.-K.
    Tang M.-X.
    Hu H.-S.
    Liu C.-L.
    Su D.-L.
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2022, 44 (01): : 153 - 162
  • [8] Quantitative Characterization of Grouting Stones for Drilling with Pre-stressed Concrete Pile Cased Pile
    Hou, Zhenkun
    Tang, Mengxiong
    Hu, Hesong
    Lin, Zegeng
    Chen, Hang
    Liu, Chunlin
    2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [9] Comparative study on the vertical load-bearing capacity of the drilling with pre-stressed concrete pipe cased pile based on in-situ and physical simulation tests
    Hou Zhen-kun
    Tang Meng-xiong
    Hu He-song
    Li Jian-hua
    Zhang Shu-wen
    Xu Xiao-bin
    Liu Chun-lin
    ROCK AND SOIL MECHANICS, 2021, 42 (02) : 419 - 429
  • [10] Engineering Characteristics and Reinforcement Program of Inclined Pre-stressed Concrete Pipe Piles
    De-quan Zhou
    Chen-xi Feng
    KSCE Journal of Civil Engineering, 2019, 23 : 3907 - 3923