共 50 条
- [43] Conditions and possibilities for financing new nuclear power plants JOURNAL OF WORLD ENERGY LAW & BUSINESS, 2019, 12 (01): : 21 - 35
- [44] A NEW METHOD OF MONITORING RADIOACTIVE AEROSOLS FROM NUCLEAR-POWER STATIONS WITH RBMK REACTORS SOVIET ATOMIC ENERGY, 1982, 53 (06): : 828 - 831
- [45] STATE-OF-THE ART AND DEVELOPMENT PROSPECTS FOR NUCLEAR-POWER STATIONS CONTAINING RBMK REACTORS SOVIET ATOMIC ENERGY, 1984, 56 (06): : 368 - 374
- [46] Radiation characteristics of reactor structures after the final shutdown of a nuclear power plant with RBMK reactors Atomic Energy, 2004, 97 : 845 - 850
- [47] Energy Complexes Consisting of Hydro and Nuclear Power Plants with Low Power Nuclear Reactors 2018 INTERNATIONAL URAL CONFERENCE ON GREEN ENERGY (URALCON), 2018, : 161 - 166
- [48] Pre-start Cleaning of the Main Equipment of Nuclear Power Plants with Channel-Type Uranium-Graphite (RBMK) Reactors. Teploenergetika, 1979, (07): : 17 - 19
- [49] Laser decommissioning of RBMK nuclear reactors fuel channels. HIGH-POWER LASERS IN CIVIL ENGINEERING AND ARCHITECTURE, 2000, 3887 : 110 - 115
- [50] CONSTRUCTION OF A MODEL OF THE PROCESS OF ACCUMULATION OF RADIONUCLIDES OF CORROSION PRODUCTS ON THE EQUIPMENT IN NUCLEAR-POWER-PLANTS WITH BOILING-WATER REACTORS SOVIET ATOMIC ENERGY, 1985, 58 (04): : 272 - 278