Fuzzy TOPSIS method to primary crusher selection for Golegohar Iron Mine (Iran)

被引:0
|
作者
Mohammad Javad Rahimdel
Mohammad Karamoozian
机构
[1] Sahand University of Technology,Department of Mining Engineering
[2] Shahrood University of Technology,Faculty of Mining Engineering, Petroleum and Geophysics
来源
关键词
primary crusher; multi-criterion decision making (MCDM); technique for order performance by similarity to ideal solution; fuzzy set theory; Golegohar Iron Mine; gyratory crusher;
D O I
暂无
中图分类号
学科分类号
摘要
Selection of the crusher required a great deal of design regarding to the mine planning. Selection of suitable primary crusher from all of available primary crushers is a multi-criterion decision making (MCDM) problem. The present work explores the use of technique for order performance by similarity to ideal solution (TOPSIS) with fuzzy set theory to select best primary crusher for Golegohar Iron Mine in Iran. Gyratory, double toggle jaw, single toggle jaw, high speed roll crusher, low speed sizer, impact crusher, hammer mill and feeder breaker crushers have been considered as alternatives. Also, the capacity, feed size, product size, rock compressive strength, abrasion index and application of primary crusher for mobile plants were considered as criteria for solution of this MCDM problem. To determine the order of the alternatives, closeness coefficient is defined by calculating the distances to the fuzzy positive ideal solution (FPIS) and fuzzy negative ideal solution (FNIS). Results of our work based on fuzzy TOPSIS method show that the gyratory is the best primary crusher for the studied mine.
引用
收藏
页码:4352 / 4359
页数:7
相关论文
共 50 条
  • [11] An Application of Fuzzy Topsis Method for Supplier Selection
    Sevkli, Mehmet
    Zaim, Selim
    Turkyilmaz, Ali
    Satir, Metin
    2010 IEEE INTERNATIONAL CONFERENCE ON FUZZY SYSTEMS (FUZZ-IEEE 2010), 2010,
  • [12] Equipment Selection by using Fuzzy TOPSIS Method
    Yavuz, Mahmut
    WORLD MULTIDISCIPLINARY EARTH SCIENCES SYMPOSIUM (WMESS 2016), PTS 1-4, 2016, 44
  • [13] Prioritization Of Plants In The Choghart Iron Ore Mine Reclamation Project By Promethee Method And Comparison With The Results Of The Fuzzy Topsis Method (Case Study: Choghart Iron Ore Mine)
    Ebrahimabadi, A.
    Alavi, I.
    Batebi, M.
    Bibakian, H.
    REVISTA PUBLICANDO, 2018, 5 (14): : 640 - 663
  • [14] Using fuzzy TOPSIS method for mineral processing plant site selectionCase study: Sangan iron ore mine (phase 2)استخدام طريقةTOPSIS لإختيار الموقع المناسب لإنشاء معمل لمعالجة المعادن
    Mohsen Safari
    Reza Kakaei
    Mohammad Ataei
    Mohammad Karamoozian
    Arabian Journal of Geosciences, 2012, 5 : 1011 - 1019
  • [15] GREEN SUPPLIER SELECTION BY USING FUZZY TOPSIS METHOD
    Dogan, Ahmet
    Stylemez, Ismet
    Ozcan, Ugur
    UNCERTAINTY MODELLING IN KNOWLEDGE ENGINEERING AND DECISION MAKING, 2016, 10 : 638 - 645
  • [16] Software Design Projects Selection by Fuzzy AHP and Fuzzy TOPSIS Method
    Sun, Jin-Wen
    Kang, Yan
    Yang, Xiao-Dong
    2015 INTERNATIONAL CONFERENCE ON MECHANICAL SCIENCE AND MECHANICAL DESIGN, MSMD 2015, 2015, : 613 - 619
  • [17] Interval type 2-fuzzy TOPSIS and fuzzy TOPSIS method in supplier selection in garment industry
    Yildiz, Aytac
    INDUSTRIA TEXTILA, 2016, 67 (05): : 322 - 332
  • [18] Optimum mining method selection using fuzzy analytical hierarchy process–Qapiliq salt mine,Iran
    Karimnia Hamed
    Bagloo Heydar
    International Journal of Mining Science and Technology, 2015, 25 (02) : 225 - 230
  • [19] Fuzzy TOPSIS Method in Supplier Selection and Application in the Garment Industry
    Yayla, A. Yesim
    Yildiz, Aytac
    Ozbek, Ahmet
    FIBRES & TEXTILES IN EASTERN EUROPE, 2012, 20 (04) : 20 - 23
  • [20] Intuitionistic Fuzzy TOPSIS method for green supplier selection problem
    Rouyendegh, Babak Daneshvar
    Yildizbasi, Abdullah
    Ustunyer, Pelin
    SOFT COMPUTING, 2020, 24 (03) : 2215 - 2228