Mathematical programming and three metaheuristic algorithms for a bi-objective supply chain scheduling problem

被引:0
|
作者
Hamid Zarei
Morteza Rasti-Barzoki
机构
[1] Isfahan University of Technology,Department of Industrial and Systems Engineering
来源
关键词
Supply chain scheduling; Non-dominated sorting genetic algorithm; Multi-objective particle swarm optimization; Transportation modes;
D O I
暂无
中图分类号
学科分类号
摘要
In this study, a bi-objective optimization problem for a supply chain with different transportation modes is addressed. The first objective function is minimizing costs imposed by production, batching, due date assignment and transportation. The second one is minimizing inventory and tardiness costs. Also, a heuristic rule is developed to choose non-dominated transportation modes. Three metaheuristic algorithms including multi-objective particle swarm optimization (MOPSO), non-dominated sorting genetic algorithm (NSGA-II) and hybrid NSGA-II (HNSGA-II) are customized to solve the problem. In addition, a theoretical improvement in the non-dominated sorting procedure called improved efficient non-dominated sorting (IENS) is proposed. Computational tests are used for comparing and evaluating the proposed methods and algorithms. The results show that IENS reduces running time compared to the modern method of non-dominated sorting, the efficient non-dominated sorting method, and this reduction is statistically significant. Also, the HNSGA-II has an average but robust performance compared to the other two algorithms.
引用
收藏
页码:9073 / 9093
页数:20
相关论文
共 50 条
  • [41] Bi-objective Optimization in Identical Parallel Machine Scheduling Problem
    Bathrinath, Sankaranarayanan
    Sankar, S. Saravana
    Ponnambalam, S. G.
    Kannan, B. K. V.
    SWARM, EVOLUTIONARY, AND MEMETIC COMPUTING, PT I (SEMCCO 2013), 2013, 8297 : 377 - 388
  • [42] Dynamic programming operators for the bi-objective Traveling Thief Problem
    Santana, Roberto
    Shakya, Siddhartha
    2020 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2020,
  • [43] On optimizing a bi-objective flowshop scheduling problem in an uncertain environment
    Liefooghe, Arnaud
    Basseur, Matthieu
    Humeau, Jeremie
    Jourdan, Laetitia
    Talbi, El-Ghazali
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2012, 64 (12) : 3747 - 3762
  • [44] Test Center Location Problem: A Bi-Objective Model and Algorithms
    Davoodi, Mansoor
    Calabrese, Justin M.
    ALGORITHMS, 2024, 17 (04)
  • [45] A multi-objective electromagnetism algorithm for a bi-objective flowshop scheduling problem
    Khalili, Majid
    Tavakkoli-Moghaddam, Reza
    JOURNAL OF MANUFACTURING SYSTEMS, 2012, 31 (02) : 232 - 239
  • [46] A bi-objective model for integrated scheduling of production and distribution in a supply chain with order release date restrictions
    Jamili, Negin
    Ranjbar, Mohammad
    Salari, Majid
    JOURNAL OF MANUFACTURING SYSTEMS, 2016, 40 : 105 - 118
  • [47] A hybrid metaheuristic with learning for a real supply chain scheduling problem
    Perez, Christian
    Climent, Laura
    Nicolo, Giancarlo
    Arbelaez, Alejandro
    Salido, Miguel A.
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2023, 126
  • [48] Exact and Metaheuristic Approaches for a Bi-Objective School Bus Scheduling Problem (vol 10, e0132600, 2015)
    Chen, Xiaopan
    Kong, Yunfeng
    Dang, Lanxue
    Hou, Yane
    Ye, Xinyue
    PLOS ONE, 2016, 11 (04):
  • [49] An enhanced genetic algorithm for bi-objective pump scheduling in water supply
    Wang, Jen-Ya
    Chang, Tsui-Ping
    Chen, Jr-Shian
    EXPERT SYSTEMS WITH APPLICATIONS, 2009, 36 (07) : 10249 - 10258
  • [50] Bi-objective Scheduling Algorithms for Optimizing Makespan and Reliability on Heterogeneous Systems
    Dongarra, Jack J.
    Jeannot, Emmanuel
    Saule, Erik
    Shi, Zhiao
    SPAA'07: PROCEEDINGS OF THE NINETEENTH ANNUAL SYMPOSIUM ON PARALLELISM IN ALGORITHMS AND ARCHITECTURES, 2007, : 280 - +