Routing and scheduling in project shipping

被引:0
|
作者
Kjetil Fagerholt
Lars Magnus Hvattum
Trond A. V. Johnsen
Jarl Eirik Korsvik
机构
[1] Norwegian University of Science and Technology,Department of Industrial Economics and Technology
[2] Norwegian Marine Technology Research Institute (MARINTEK),Department of Marine Technology
[3] Norwegian University of Science and Technology,undefined
来源
关键词
Maritime transportation; Tabu search; Stowage; Cargo coupling;
D O I
暂无
中图分类号
学科分类号
摘要
Tramp shipping companies are committed to transport a set of contracted cargoes and try to derive additional revenue from carrying optional spot cargoes. Here, we present a real life ship routing and scheduling problem for a shipping company operating in project shipping, a special segment of tramp shipping. This segment differs from more traditional tramp segments, as the cargoes are usually transported on a one-time basis. Because of the special nature of the cargoes, complicating requirements regarding stowage onboard the ships and cargo coupling must be considered while determining routes and schedules for the ships in the fleet. A mathematical model is presented and a tabu search heuristic is proposed to solve the problem. Computational results show that the tabu search heuristic provides optimal or near-optimal solutions in a reasonable amount of time, and that it can give significant improvements to manual planning for the shipping company.
引用
收藏
页码:67 / 81
页数:14
相关论文
共 50 条
  • [41] Scheduling issues in vehicle routing
    Laporte, Gilbert
    ANNALS OF OPERATIONS RESEARCH, 2016, 236 (02) : 463 - 474
  • [42] OPTIMAL ROUTING AND SCHEDULING OF SHIPS
    MOISEENKO, GE
    AUTOMATION AND REMOTE CONTROL, 1991, 52 (04) : 567 - 571
  • [43] Heuristic algorithm for integrated ship scheduling, routing and stowage problem in multi-vessel roll-on/roll-off shipping
    Zhao, Yuzhe
    Peng, Peiyun
    Zhou, Jingmiao
    Wang, Yadong
    JOURNAL OF HEURISTICS, 2025, 31 (01)
  • [44] EuroROSE:: A project to support shipping in port approaches
    Günther, H
    Gurgel, KW
    Breivik, O
    Guddal, J
    Wyatt, LR
    Borge, JCN
    IGARSS 2001: SCANNING THE PRESENT AND RESOLVING THE FUTURE, VOLS 1-7, PROCEEDINGS, 2001, : 2474 - 2476
  • [45] Greening international shipping through private governance: A case study of the Clean Shipping Project
    Wuisan, Lindsey
    van Leeuwen, Judith
    van Koppen, C. S. A.
    MARINE POLICY, 2012, 36 (01) : 165 - 173
  • [46] The liner shipping berth scheduling problem with transit times
    Reinhardt, Line Blander
    Plum, Christian E. M.
    Pisinger, David
    Sigurd, Mikkel M.
    Vial, Guillaume T. P.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2016, 86 : 116 - 128
  • [47] On Project Scheduling Problem
    Lazarev, A. A.
    Gafarov, E. R.
    AUTOMATION AND REMOTE CONTROL, 2008, 69 (12) : 2070 - 2087
  • [48] Project management and scheduling
    Valls, V
    Weglarz, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2005, 165 (02) : 285 - 288
  • [49] Project scheduling - Preface
    Ulusoy, G
    Herroelen, W
    ANNALS OF OPERATIONS RESEARCH, 2001, 102 : 13 - 16
  • [50] On project scheduling problem
    A. A. Lazarev
    E. R. Gafarov
    Automation and Remote Control, 2008, 69 : 2070 - 2087