One approach to solving a discrete production planning problem with interval data

被引:0
|
作者
M. V. Devyaterikova
A. A. Kolokolov
A. P. Kolosov
机构
[1] Siberian Division of the Russian Academy of Sciences,Omsk Branch of the Sobolev Institute of Mathematics
关键词
STEKLOV Institute; Linear Programming Problem; Knapsack Problem; Interval Data; Integer Point;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we develop an approach to solving integer programming problems with interval data based on using the possibilities of varying the relaxation set of the problem. This is illustrated by means of an L-class enumeration algorithm for solving a dicrete production planning problem. We describe the algorithm and a number of its modifications and present results of a computational experiment for families of problems from the OR Library and with randomly generated initial data. This approach is also applied to obtain approximate solutions of the mentioned problem in its conventional setting.
引用
收藏
页码:37 / 46
页数:9
相关论文
共 50 条
  • [41] A Problem-Solving Approach to Data Analysis for Economics
    Giannakouros, Panayotis
    Chen, Lihua
    FORUM FOR SOCIAL ECONOMICS, 2018, 47 (01) : 87 - 114
  • [42] Solving the electricity production planning problem by a column generation based heuristic
    Antoine Rozenknop
    Roberto Wolfler Calvo
    Laurent Alfandari
    Daniel Chemla
    Lucas Létocart
    Journal of Scheduling, 2013, 16 : 585 - 604
  • [43] METHOD FOR SOLVING MULTIOBJECTIVE AGGREGATE PRODUCTION PLANNING PROBLEM WITH FUZZY PARAMETERS
    GEN, M
    TSUJIMURA, Y
    IDA, K
    COMPUTERS & INDUSTRIAL ENGINEERING, 1992, 23 (1-4) : 117 - 120
  • [44] Solving Aggregate Production Planning Problems: An Extended TOPSIS Approach
    Yu, Vincent F.
    Kao, Hsuan-Chih
    Chiang, Fu-Yuan
    Lin, Shih-Wei
    APPLIED SCIENCES-BASEL, 2022, 12 (14):
  • [45] A Hybrid Algorithm for Solving a Bilevel Production-Distribution Planning Problem
    Calvete, Herminia I.
    Gale, Carmen
    Oliveros, Maria-Jose
    MODELING AND SIMULATION IN ENGINEERING, ECONOMICS, AND MANAGEMENT, 2013, 145 : 138 - 144
  • [46] Solving the electricity production planning problem by a column generation based heuristic
    Rozenknop, Antoine
    Calvo, Roberto Wolfler
    Alfandari, Laurent
    Chemla, Daniel
    Letocart, Lucas
    JOURNAL OF SCHEDULING, 2013, 16 (06) : 585 - 604
  • [47] About one approach to solving the inverse problem for parabolic equation
    Zhabko, A. P.
    Nurtazina, K. B.
    Provotorov, V. V.
    VESTNIK SANKT-PETERBURGSKOGO UNIVERSITETA SERIYA 10 PRIKLADNAYA MATEMATIKA INFORMATIKA PROTSESSY UPRAVLENIYA, 2019, 15 (03): : 323 - 336
  • [48] On One Approach to Solving an Applied Control Problem with State Constraints
    Kandoba, I. N.
    PROCEEDINGS OF THE STEKLOV INSTITUTE OF MATHEMATICS, 2024, 327 (SUPPL1) : S138 - S154
  • [49] SOLVING ONE PROBLEM OF THE MATHEMATICAL-PROCESSING OF ELECTROENCEPHALOGRAPHIC DATA
    ZAKHAROV, EV
    KOPTELOV, IM
    DOKLADY AKADEMII NAUK SSSR, 1987, 292 (03): : 576 - 581
  • [50] A five-phase combinatorial approach for solving a fuzzy linear programming supply chain production planning problem
    Sutthibutr, Noppasorn
    Chiadamrong, Navee
    Hiraishi, Kunihiko
    Thajchayapong, Suttipong
    COGENT ENGINEERING, 2024, 11 (01):