Integrating the multi-objective elephant herding optimization based time–cost trade-off model with earned value management

被引:0
|
作者
Gupta R. [1 ]
Trivedi M.K. [1 ]
机构
[1] Department of Civil Engineering, Madhav Institute of Technology and Science, Gwalior
关键词
Earned value management; Multi-objective elephant herding optimization; Scheduling and rescheduling; Time–cost trade-off problems;
D O I
10.1007/s42107-022-00551-8
中图分类号
学科分类号
摘要
A construction project consists of many interconnected activities, and each activity can be performed by different alternatives differing in resource consumption, completion time and completion cost. Before performing the actual construction, noteworthy amount of attention has been given to construction project scheduling while solving the time–cost trade-off problems (TCTPs). On the other hand, based on earned value management (EVM) concept, the project should be rescheduled in the execution phase if it gets off-track from the actual budgeted time and cost. For this purpose, at first, this paper determines the multi-objective elephant herding optimization (MOEHO) based best combination of activities alternatives and then predict the overall performance of the project at a particular point of execution using EVM concept. The new alternatives are required to be allocated to the project’s activities if the predicted performance of the project indicates towards rescheduling. The developed EVM-TCT model can facilitate the construction managers to schedule, control and reschedule the real-life construction projects before and during the execution phase. The developed model is also applied to a case study project to demonstrate its applicability and efficiency. Moreover, the superiority of the developed model is demonstrated after comparing the obtained results against those which were obtained through existing TCT models. © 2022, Crown.
引用
收藏
页码:1027 / 1039
页数:12
相关论文
共 50 条
  • [21] Model mismatch in multi-objective optimisation and preservation of trade-off order
    Reynoso-Meza, Gilberto
    Vignoni, Alejandro
    Boada, Yadira
    Pico, Jesus
    Pico, Enric
    IFAC PAPERSONLINE, 2019, 52 (26): : 249 - 254
  • [22] The risk element transmission theory research of multi-objective risk-time-cost trade-off
    Li, Cunbin
    Wang, Kecheng
    COMPUTERS & MATHEMATICS WITH APPLICATIONS, 2009, 57 (11-12) : 1792 - 1799
  • [23] A Multi-objective Stochastic Programming Approach for Project Time, Cost and Quality Trade-off Problem (TCQTP)
    Ahadian, Behrooz
    Veisy, Omid
    Azizi, Vahid
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2016, 10 (04) : 553 - 563
  • [24] Multi-objective time-cost trade-off in dynamic PERT networks using an interactive approach
    Azaron, Amir
    Tavakkoli-Moghaddam, Reza
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2007, 180 (03) : 1186 - 1200
  • [25] Trade-off analysis in multi-objective optimization using Chebyshev orthogonal polynomials
    Baek, SH
    Cho, SS
    Kim, HS
    Joo, WS
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2006, 20 (03) : 366 - 375
  • [26] Trade-off analysis in multi-objective optimization using Chebyshev orthogonal polynomials
    Seok-Heum Baek
    Seok-Swoo Cho
    Hyun-Su Kim
    Won-Sik Joo
    Journal of Mechanical Science and Technology, 2006, 20 : 366 - 375
  • [27] Multi-objective trade-off optimal control of energy management for hybrid system
    T. Deng
    P. Tang
    CH. S. Lin
    X. Li
    Journal of the Brazilian Society of Mechanical Sciences and Engineering, 2018, 40
  • [28] Multi-objective trade-off optimal control of energy management for hybrid system
    Deng, T.
    Tang, P.
    Lin, CH. S.
    Li, X.
    JOURNAL OF THE BRAZILIAN SOCIETY OF MECHANICAL SCIENCES AND ENGINEERING, 2018, 40 (04)
  • [29] Multi-objective workflow scheduling in cloud computing: trade-off between makespan and cost
    Belgacem, Ali
    Beghdad-Bey, Kadda
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2022, 25 (01): : 579 - 595
  • [30] Multi-objective workflow scheduling in cloud computing: trade-off between makespan and cost
    Ali Belgacem
    Kadda Beghdad-Bey
    Cluster Computing, 2022, 25 : 579 - 595