共 50 条
- [42] Preemptive scheduling in a two-stage multiprocessor flowshop with resource constraints ICINCO 2006: PROCEEDINGS OF THE THIRD INTERNATIONAL CONFERENCE ON INFORMATICS IN CONTROL, AUTOMATION AND ROBOTICS: INTELLIGENT CONTROL SYSTEMS AND OPTIMIZATION, 2006, : 130 - 135
- [43] Resource Bounding for Non-preemptive Task Scheduling on a Multiprocessor Platform PROCEEDINGS OF 2016 18TH INTERNATIONAL SYMPOSIUM ON SYMBOLIC AND NUMERIC ALGORITHMS FOR SCIENTIFIC COMPUTING (SYNASC), 2016, : 149 - 156
- [44] Feasibility intervals for multiprocessor fixed-priority scheduling of arbitrary deadline periodic systems 2007 DESIGN, AUTOMATION & TEST IN EUROPE CONFERENCE & EXHIBITION, VOLS 1-3, 2007, : 1635 - 1640
- [45] Scheduling multiprocessor job with resource and timing constraints using neural networks IEEE Trans Syst Man Cybern Part B Cybern, 4 (490-502):
- [46] Resource Sharing in Global Fixed-Priority Preemptive Multiprocessor Scheduling 2009 30TH IEEE REAL-TIME SYSTEMS SYMPOSIUM, PROCEEDINGS, 2009, : 377 - 386
- [48] Scheduling multiprocessor job with resource and timing constraints using neural networks IEEE TRANSACTIONS ON SYSTEMS MAN AND CYBERNETICS PART B-CYBERNETICS, 1999, 29 (04): : 490 - 502
- [50] Polynomial algorithms for resource-constrained and multiprocessor task scheduling problems Eur J Oper Res, 2 (214-226):