Semi-Online Algorithms for Scheduling with Machine Cost

被引:0
|
作者
Yi-Wei Jiang
Yong He
机构
[1] Zhejiang Sci-Tech University,Faculty of Science
[2] Zhejiang University,Department of Mathematics
关键词
semi-online; preemptive scheduling; machine cost; competitive ratio;
D O I
暂无
中图分类号
学科分类号
摘要
In this paper, we consider the following semi-online List Model problem with known total size. We are given a sequence of independent jobs with positive sizes, which must be assigned to be processed on machines. No machines are initially provided, and when a job is revealed the algorithm has the option to purchase new machines. By normalizing all job sizes and machine cost, we assume that the cost of purchasing one machine is 1. We further know the total size of all jobs in advance. The objective is to minimize the sum of the makespan and the number of machines to be purchased. Both non-preemptive and preemptive versions are considered. For the non-preemptive version, we present a new lower bound 6/5 which improves the known lower bound 1.161. For the preemptive version, we present an optimal semi-online algorithm with a competitive ratio of 1 in the case that the total size is not greater than 4, and an algorithm with a competitive ratio of 5/4 otherwise, while a lower bound 1.0957 is also presented for general case.
引用
收藏
页码:984 / 988
页数:4
相关论文
共 50 条
  • [41] Semi-online scheduling with “end of sequence” information
    Leah Epstein
    Deshi Ye
    Journal of Combinatorial Optimization, 2007, 14 : 45 - 61
  • [42] Semi-online scheduling on two uniform processors
    Angelelli, Enrico
    Speranza, Maria Grazia
    Tuza, Zsolt
    THEORETICAL COMPUTER SCIENCE, 2008, 393 (1-3) : 211 - 219
  • [43] Semi-online scheduling for jobs with release times
    Rongheng Li
    Liying Yang
    Xiaoqiong He
    Qiang Chen
    Xiayan Cheng
    Journal of Combinatorial Optimization, 2013, 26 : 448 - 464
  • [44] Semi-online scheduling with GoS eligibility constraints
    Lee, Kangbok
    Hwang, Hark-Chin
    Lim, Kyungkuk
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2014, 153 : 204 - 214
  • [45] Extension of algorithm list scheduling for a semi-online scheduling problem
    Yong He
    György Dósa
    Central European Journal of Operations Research, 2007, 15 : 97 - 104
  • [46] Semi-online scheduling with "end of sequence" information
    Epstein, Leah
    Ye, Deshi
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2007, 14 (01) : 45 - 61
  • [47] Semi-online scheduling for jobs with release times
    Li, Rongheng
    Yang, Liying
    He, Xiaoqiong
    Chen, Qiang
    Cheng, Xiayan
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2013, 26 (03) : 448 - 464
  • [48] Optimal semi-online preemptive algorithms for machine covering on two uniform machines
    He, Y
    Jiang, YW
    THEORETICAL COMPUTER SCIENCE, 2005, 339 (2-3) : 293 - 314
  • [49] Extension of algorithm list scheduling for a semi-online scheduling problem
    He, Yong
    Dosa, Gyoergy
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2007, 15 (01) : 97 - 104
  • [50] Semi-online scheduling problems on a small number of machines
    Lee, Kangbok
    Lim, Kyungkuk
    JOURNAL OF SCHEDULING, 2013, 16 (05) : 461 - 477