Research on progressive failure process of Baishuihe landslide based on Monte Carlo model

被引:0
|
作者
Fasheng Miao
Yiping Wu
Yuanhua Xie
Feng Yu
Lijuan Peng
机构
[1] China University of Geosciences,Faculty of Engineering
[2] Ministry of Education,Three Gorges Research Center for Geo
关键词
Landslide; Monte Carlo; Numerical simulation; Progressive failure; Reservoir level; Rainfall;
D O I
暂无
中图分类号
学科分类号
摘要
To the progressive landslide, development of the internal deformation and failure situation can’t be accurately reflected by the overall stability of coefficients and failure probability. But this problem can be solved by utilizing the principle of progressive failure by slices. Taking the warning area of Baishuihe landslide as an example, 5 days accumulated rainfall in different reappearing period is computed by Gumbel model. The failure probability of each slice is calculated by progressive failure principle, which is based on Monte Carlo model. The following results can be revealed through calculation: Overall stability and failure probability can’t reflect real situation of Baishuihe landslide warning area. Through building the calculation of progressive failure model of each slice, the stability of each part in the Baishuihe landslide warning area is quite different. Unstable region mainly lies in vicinity of the middle and posterior warning area. The front of the warning area remains stable. Deformation characteristics of the warning area are consistent with the investigation report. The scope of unstable area increased gradually with rainfall and the decline of reservoir water. Under 5 day’s accumulated rainfall of 50 years, the poor stable and unstable region reached 75 %, there is a large possibility of local deformation slip. Under the joint action of rainfall and reservoir water level, the warning area of Baishuihe landslide shows a progressive failure mode from top to bottom.
引用
收藏
页码:1683 / 1696
页数:13
相关论文
共 50 条
  • [1] Research on progressive failure process of Baishuihe landslide based on Monte Carlo model
    Miao, Fasheng
    Wu, Yiping
    Xie, Yuanhua
    Yu, Feng
    Peng, Lijuan
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2017, 31 (07) : 1683 - 1696
  • [2] Research on reliability simulation process model based on Monte Carlo method
    Zhang, Yu-Tao
    Tang, Jun
    Zhang, Ming-Qing
    Lin, Chang-Chun
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2008, 30 (07): : 1374 - 1377
  • [3] Monte Carlo based model of photodynamic therapy process
    Hu, XH
    Lu, JQ
    Allison, RR
    Downie, GH
    Cuenca, RE
    Sibata, CH
    MEDICAL PHYSICS, 2003, 30 (06) : 1513 - 1513
  • [4] Monte Carlo Based Toy Model for Fission Process
    Kurniadi, R.
    Waris, A.
    Viridi, S.
    4TH INTERNATIONAL CONFERENCE ON ADVANCES IN NUCLEAR SCIENCE AND ENGINEERING (ICANSE 2013), 2014, 1615 : 133 - 136
  • [5] Analysis for progressive failure of the Senise landslide based on Cosserat continuum model
    Tang, H. X.
    LANDSLIDES AND ENGINEERED SLOPES: FROM THE PAST TO THE FUTURE, VOLS 1 AND 2, 2008, : 945 - +
  • [6] Monte Carlo simulation based toy model for fission process
    Kurniadi, Rizal
    Waris, Abdul
    Viridi, Sparisoma
    INTERNATIONAL JOURNAL OF MODERN PHYSICS C, 2016, 27 (03):
  • [7] MONTE CARLO MODEL OF A FRACTURE PROCESS
    HARRIS, CC
    NATURE, 1966, 209 (5030) : 1302 - &
  • [8] Quantification of model uncertainty and variability for landslide displacement prediction based on Monte Carlo simulation
    Wang, Luqi
    Xiao, Ting
    Liu, Songlin
    Zhang, Wengang
    Yang, Beibei
    Chen, Lichuan
    GONDWANA RESEARCH, 2023, 123 : 27 - 40
  • [9] Dynamic progressive failure evolution research on landslide under precipitation
    Wang, Yu
    Li, Xiao
    Zhang, Bo
    Li, Ming
    Shuili Xuebao/Journal of Hydraulic Engineering, 2013, 44 (04): : 416 - 425
  • [10] Research on Surface Target Strike Process Planning Based on Monte Carlo Algorithm
    Liu, Wei
    Lv, Mingwei
    Zhang, Shaoqing
    Song, Yike
    Hu, Jinwen
    2021 PROCEEDINGS OF THE 40TH CHINESE CONTROL CONFERENCE (CCC), 2021, : 3662 - 3666