Maximization Problems in Single Machine Scheduling

被引:0
|
作者
Mohamed Ali Aloulou
Mikhail Y. Kovalyov
Marie-Claude Portmann
机构
[1] MACSI team of INRIA-Lorraine and LORIA-INPL,Ecole des Mines de Nancy, Parc de Saurupt
[2] Belarus State University,Faculty of Economics
来源
关键词
scheduling; semi-active schedules; maximization problem; release times; precedence constraints;
D O I
暂无
中图分类号
学科分类号
摘要
Problems of scheduling n jobs on a single machine to maximize regular objective functions are studied. Precedence constraints may be given on the set of jobs and the jobs may have different release times. Schedules of interest are only those for which the jobs cannot be shifted to start earlier without changing job sequence or violating release times or precedence constraints. Solutions to the maximization problems provide an information about how poorly such schedules can perform. The most general problem of maximizing maximum cost is shown to be reducible to n similar problems of scheduling n−1 jobs available at the same time. It is solved in O(mn+n2) time, where m is the number of arcs in the precedence graph. When all release times are equal to zero, the problem of maximizing the total weighted completion time or the weighted number of late jobs is equivalent to its minimization counterpart with precedence constraints reversed with respect to the original ones. If there are no precedence constraints, the problem of maximizing arbitrary regular function reduces to n similar problems of scheduling n−1 jobs available at the same time.
引用
收藏
页码:21 / 32
页数:11
相关论文
共 50 条
  • [41] An Investigation of Phase Transitions in Single-Machine Scheduling Problems
    Wang, Zhihui
    O'Gorman, Bryan
    Tran, Tony T.
    Rieffel, Eleanor G.
    Frank, Jeremy
    Minh Do
    TWENTY-SEVENTH INTERNATIONAL CONFERENCE ON AUTOMATED PLANNING AND SCHEDULING, 2017, : 325 - 329
  • [42] A simulated annealing approach to bicriteria scheduling problems on a single machine
    Karasakal, EK
    Köksalan, M
    JOURNAL OF HEURISTICS, 2000, 6 (03) : 311 - 327
  • [43] Single-machine group scheduling problems with deteriorating jobs
    Ji-Bo Wang
    Lin Lin
    Feng Shan
    The International Journal of Advanced Manufacturing Technology, 2008, 39 : 808 - 812
  • [44] SOLUTION APPROACHES TO MULTICRITERIA SINGLE-MACHINE SCHEDULING PROBLEMS
    FIALA, P
    KURTEVOVA, S
    VOPALKOVA, E
    EKONOMICKO-MATEMATICKY OBZOR, 1988, 24 (03): : 320 - 333
  • [45] Two due date assignment problems in scheduling a single machine
    Shabtay, Dvir
    Steiner, George
    OPERATIONS RESEARCH LETTERS, 2006, 34 (06) : 683 - 691
  • [46] Single-machine group scheduling problems with deteriorating jobs
    Wang, Ji-Bo
    Lin, Lin
    Shan, Feng
    International Journal of Advanced Manufacturing Technology, 2008, 39 (7-8): : 808 - 812
  • [47] A Simulated Annealing Approach to Bicriteria Scheduling Problems on a Single Machine
    Esra Köktener Karasakal
    Murat Köksalan
    Journal of Heuristics, 2000, 6 : 311 - 327
  • [48] A meta-heuristic approach to single machine scheduling problems
    Maheswaran, R
    Ponnambalam, SG
    Aravindan, C
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 25 (7-8): : 772 - 776
  • [49] Single-machine group scheduling problems with deterioration consideration
    Wu, Chin-Chia
    Shiau, Yau-Ren
    Lee, Wen-Chiung
    COMPUTERS & OPERATIONS RESEARCH, 2008, 35 (05) : 1652 - 1659
  • [50] Learning effect and deteriorating jobs in the single machine scheduling problems
    Wang, Ji-Bo
    Huang, Xue
    Wang, Xiao-Yuan
    Yin, Na
    Wang, Li-Yan
    APPLIED MATHEMATICAL MODELLING, 2009, 33 (10) : 3848 - 3853