共 50 条
- [41] Research on two stage case-based reasoning for the dynamic scheduling system of iron and steel works Kongzhi yu Juece/Control and Decision, 2004, 19 (10): : 1109 - 1112
- [44] Oxygen Demand Forecasting and Optimal Scheduling of the Oxygen Gas Systems in Iron- and Steel-Making Enterprises APPLIED SCIENCES-BASEL, 2023, 13 (21):
- [45] Modelling for finished product forecasting in iron-steel enterprise 2003, Northeastern University (24):
- [46] Burners in the steel industry: utilization of by-product combustion gases in reheating furnaces and annealing lines INFUB - 11TH EUROPEAN CONFERENCE ON INDUSTRIAL FURNACES AND BOILERS (INFUB-11), 2017, 120 : 20 - 27
- [47] Prediction and Optimal Scheduling of Byproduct Gases in Steel Mill: Trends and Challenges ENERGY MATERIALS 2017, 2017, : 41 - 50
- [49] OPTIMIZATION OF ENERGY-DISTRIBUTION IN INTEGRATED IRON AND STEEL WORKS STAHL UND EISEN, 1988, 108 (22): : 1097 - 1106
- [50] Development of Energy Management System in Integrated Iron and Steel Works ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEMS AND MATERIAL ENGINEERING, PTS 1-7, 2011, 204-210 : 1737 - 1740