On Scheduling Parallel Tasks at Twilight

被引:0
|
作者
H. Bast
机构
[1] Max-Planck-Institut für Informatik,
[2] 66123 Saarbrücken,undefined
[3] Germany hannah@mpi-sb.mpg.de,undefined
来源
关键词
Idle Time; Schedule Scheme; Variance Estimator; Progress Rate; Total Processing Time;
D O I
暂无
中图分类号
学科分类号
摘要
We consider the problem of processing a given number of tasks on a given number of processors as quickly as possible when only vague information about the processing time of a task is available before it is completed. Whenever a processor is idle, it can be assigned, at the price of a certain overhead, a portion, called a chunk, of the unassigned tasks. The goal is to minimize the makespan, that is, the time that passes until all the tasks are completed. The difficulty then is to find the optimal tradeoff between the processors' load balance, which is favoured by having small, and therefore many, chunks, and the total scheduling overhead, which is lower when there are fewer chunks. This scheduling problem has been the subject of intensive research in the past, and a large variety of heuristics have been proposed. Its mathematical analysis, however, turned out to be difficult even for simplistic models of the vague-information issue, and little theoretical work has been presented to date. In this work we present a novel theoretical model that covers a multitude of natural vague-information scenarios, and for which we can prove general upper and lower bounds on the achievable makespan. From this we derive optimal bounds and algorithms for a whole variety of specific scenarios, including the modelling of task processing times as independent, identically distributed random variables, which guided the design of most of the previously existing heuristics. Unlike traditional approaches, our model neither ignores a priori knowledge of the input (the processing times) nor does it restrict the distribution of the input, but instead works with the concepts of an a priori estimate of the processing times, which is implicit in every algorithm, and a measure for the deviation of this estimate from the actual processing times, which is not known until all the tasks are completed.
引用
收藏
页码:489 / 563
页数:74
相关论文
共 50 条
  • [11] Scheduling of Parallel Tasks with Proportionate Priorities
    Muhammad Khurram Bhatti
    Isil Oz
    Konstantin Popov
    Mats Brorsson
    Umer Farooq
    Arabian Journal for Science and Engineering, 2016, 41 : 3279 - 3295
  • [12] Programming support and scheduling for communicating parallel tasks
    Duemmler, Joerg
    Rauber, Thomas
    Ruenger, Gudula
    JOURNAL OF PARALLEL AND DISTRIBUTED COMPUTING, 2013, 73 (02) : 220 - 234
  • [13] Scheduling parallel tasks with sequential heads and tails
    Drozdowski, M
    Kubiak, W
    ANNALS OF OPERATIONS RESEARCH, 1999, 90 (0) : 221 - 246
  • [14] Parallel Scheduling of Data-Intensive Tasks
    Meng, Xiao
    Golab, Lukasz
    EURO-PAR 2020: PARALLEL PROCESSING, 2020, 12247 : 117 - 133
  • [15] A HEURISTIC OF SCHEDULING PARALLEL TASKS AND ITS ANALYSIS
    WANG, QZ
    CHENG, KH
    SIAM JOURNAL ON COMPUTING, 1992, 21 (02) : 281 - 294
  • [16] Scheduling multiprocessor tasks on two parallel processors
    Blazewicz, J
    Dell'Olmo, P
    Drozdowski, M
    RAIRO-OPERATIONS RESEARCH, 2002, 36 (01): : 37 - 51
  • [17] Scheduling coupled tasks on parallel identical machines
    Khatami, Mostafa
    Oron, Daniel
    Salehipour, Amir
    OPTIMIZATION LETTERS, 2024, 18 (04) : 991 - 1003
  • [18] Scheduling coupled tasks on parallel identical machines
    Mostafa Khatami
    Daniel Oron
    Amir Salehipour
    Optimization Letters, 2024, 18 : 991 - 1003
  • [19] SCHEDULING OF STOCHASTIC TASKS ON 2 PARALLEL PROCESSORS
    PINEDO, M
    WEISS, G
    NAVAL RESEARCH LOGISTICS, 1979, 26 (03) : 527 - 535
  • [20] Adaptive scheduling of parallel computations for SPMD tasks
    Panshenskov, Mikhail
    Vakhitov, Alexander
    COMPUTATIONAL SCIENCE AND ITS APPLICATIONS - ICCSA 2007, PT 2, PROCEEDINGS, 2007, 4706 : 38 - 50