On Scheduling Parallel Tasks at Twilight

被引:0
|
作者
H. Bast
机构
[1] Max-Planck-Institut für Informatik,
[2] 66123 Saarbrücken,undefined
[3] Germany hannah@mpi-sb.mpg.de,undefined
来源
关键词
Idle Time; Schedule Scheme; Variance Estimator; Progress Rate; Total Processing Time;
D O I
暂无
中图分类号
学科分类号
摘要
We consider the problem of processing a given number of tasks on a given number of processors as quickly as possible when only vague information about the processing time of a task is available before it is completed. Whenever a processor is idle, it can be assigned, at the price of a certain overhead, a portion, called a chunk, of the unassigned tasks. The goal is to minimize the makespan, that is, the time that passes until all the tasks are completed. The difficulty then is to find the optimal tradeoff between the processors' load balance, which is favoured by having small, and therefore many, chunks, and the total scheduling overhead, which is lower when there are fewer chunks. This scheduling problem has been the subject of intensive research in the past, and a large variety of heuristics have been proposed. Its mathematical analysis, however, turned out to be difficult even for simplistic models of the vague-information issue, and little theoretical work has been presented to date. In this work we present a novel theoretical model that covers a multitude of natural vague-information scenarios, and for which we can prove general upper and lower bounds on the achievable makespan. From this we derive optimal bounds and algorithms for a whole variety of specific scenarios, including the modelling of task processing times as independent, identically distributed random variables, which guided the design of most of the previously existing heuristics. Unlike traditional approaches, our model neither ignores a priori knowledge of the input (the processing times) nor does it restrict the distribution of the input, but instead works with the concepts of an a priori estimate of the processing times, which is implicit in every algorithm, and a measure for the deviation of this estimate from the actual processing times, which is not known until all the tasks are completed.
引用
收藏
页码:489 / 563
页数:74
相关论文
共 50 条
  • [1] On scheduling parallel tasks at twilight
    Bast, H
    THEORY OF COMPUTING SYSTEMS, 2000, 33 (5-6) : 489 - 563
  • [2] SCHEDULING PARALLEL TASKS ON HYPERCUBES
    LIN, JF
    CHEN, SJ
    ELECTRONICS LETTERS, 1994, 30 (11) : 841 - 842
  • [3] LIST SCHEDULING OF PARALLEL TASKS
    WANG, QZ
    CHENG, KH
    INFORMATION PROCESSING LETTERS, 1991, 37 (05) : 291 - 297
  • [4] Online scheduling of moldable parallel tasks
    Deshi Ye
    Danny Z. Chen
    Guochuan Zhang
    Journal of Scheduling, 2018, 21 : 647 - 654
  • [5] Scheduling parallel tasks with individual deadlines
    Kwon, OH
    Chwa, KY
    THEORETICAL COMPUTER SCIENCE, 1999, 215 (1-2) : 209 - 223
  • [6] Scheduling of Parallel Tasks with Proportionate Priorities
    Bhatti, Muhammad Khurram
    Oz, Isil
    Popov, Konstantin
    Brorsson, Mats
    Farooq, Umer
    ARABIAN JOURNAL FOR SCIENCE AND ENGINEERING, 2016, 41 (08) : 3279 - 3295
  • [7] Static scheduling of conditional parallel tasks
    Huang, Lin
    Oudshoorn, Michael J.
    Chinese Journal of Advanced Software Research, 1999, 6 (02): : 121 - 129
  • [8] SCHEDULING PARALLEL PROCESSABLE TASKS FOR A UNIPROCESSOR
    RAMAMOORTHY, CV
    FOX, TF
    LI, HF
    IEEE TRANSACTIONS ON COMPUTERS, 1976, 25 (05) : 485 - 495
  • [9] Scheduling interval ordered tasks in parallel
    Sunder, S
    He, X
    JOURNAL OF ALGORITHMS-COGNITION INFORMATICS AND LOGIC, 1998, 26 (01): : 34 - 47
  • [10] Online scheduling of moldable parallel tasks
    Ye, Deshi
    Chen, Danny Z.
    Zhang, Guochuan
    JOURNAL OF SCHEDULING, 2018, 21 (06) : 647 - 654