共 50 条
- [21] A branch-and-bound algorithm for minimizing the total completion time in two-machine flowshop problem subject to release dates CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 80 - +
- [24] Minimizing total completion time for UET tasks with release time and outtree precedence constraints Mathematical Methods of Operations Research, 2005, 62 : 275 - 279
- [26] Minimizing average completion of dedicated tasks and interval graphs APPROXIMATION, RANDOMIZATION, AND COMBINATORIAL OPTIMIZATION: ALGORITHMS AND TECHNIQUES, 2001, 2129 : 114 - 126
- [27] Minimizing the Total Completion Time in a Two-machine Flowshop with Release Times PROCEEDINGS OF THE 2012 24TH CHINESE CONTROL AND DECISION CONFERENCE (CCDC), 2012, : 4136 - 4140