A Local Search Algorithm for the Resource-Constrained Project Scheduling Problem

被引:0
|
作者
Goncharov E.N. [1 ,2 ]
机构
[1] Sobolev Institute of Mathematics, Siberian Branch, Russian Academy ofSciences, Novosibirsk
[2] Novosibirsk State University, Novosibirsk
关键词
PSPLIB; renewable resources; resource-constrained project scheduling problem; Tabu search; variable neighborhood search;
D O I
10.1134/S1990478922040081
中图分类号
学科分类号
摘要
Abstract: We consider the resource-constrained project scheduling problem (RCPSP). The problemaccounts for technological constraints of activities precedence together with resource constraints.All resources are renewable. Activities interruptions are not allowed. This problem is NP-hard inthe strong sense. We present a new local search algorithm that uses a Tabu-list and two types ofneighborhoods. The algorithm is evaluated using three data bases of instances of the problem: 480instances of 60 activities, 480 of 90, and 600 of 120 activities, respectively, taken from the PSPLIBlibrary available online. Numerical experiments demonstrate that the proposed algorithm producesbetter results than existing algorithms described in the literature for large-sized instances. Forsome instances from the dataset j120, the best known heuristic solutions were improved. © 2022, Pleiades Publishing, Ltd.
引用
收藏
页码:672 / 683
页数:11
相关论文
共 50 条
  • [21] A branch and bound algorithm for the resource-constrained project scheduling problem
    Brucker, P
    Knust, S
    Schoo, A
    Thiele, O
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1998, 107 (02) : 272 - 288
  • [22] A genetic algorithm for solving resource-constrained project scheduling problem
    Wang, H
    Lin, D
    Li, MQ
    ADVANCES IN NATURAL COMPUTATION, PT 3, PROCEEDINGS, 2005, 3612 : 185 - 193
  • [23] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, (05) : 376 - 382
  • [24] Efficient Genetic Algorithm for Resource-Constrained Project Scheduling Problem
    王宏
    李同玲
    林丹
    Transactions of Tianjin University, 2010, 16 (05) : 376 - 382
  • [25] An improved PSO algorithm for resource-constrained project scheduling problem
    Luo, Xinggang
    Wang, Dingwei
    Tang, Jianfu
    Tu, Yiliu
    WCICA 2006: SIXTH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-12, CONFERENCE PROCEEDINGS, 2006, : 3514 - +
  • [26] Heuristic algorithm for flexible resource-constrained project scheduling problem
    Jia, Yan
    Wang, Zhimin
    Zhang, Yuegang
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2015, 21 (07): : 1846 - 1855
  • [27] Efficient genetic algorithm for resource-constrained project scheduling problem
    Wang H.
    Li T.
    Lin D.
    Transactions of Tianjin University, 2010, 16 (5) : 376 - 382
  • [28] A hybrid genetic algorithm for the resource-constrained project scheduling problem
    Valls, Vicente
    Ballestin, Francisco
    Quintanilla, Sacramento
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2008, 185 (02) : 495 - 508
  • [29] An estimation of distribution algorithm for resource-constrained project scheduling problem
    Fang, Chen
    Wang, Ling
    Xu, Ye
    2010 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-5, 2010, : 265 - 270
  • [30] Solving Resource-Constrained Project Scheduling Problem by Genetic Algorithm
    Kadam, Sachin U.
    Kadam, Narendra S.
    2014 2ND INTERNATIONAL CONFERENCE ON BUSINESS AND INFORMATION MANAGEMENT (ICBIM), 2014,