Water Transfer Triggering Mechanism for Multi-Reservoir Operation in Inter-Basin Water Transfer-Supply Project

被引:0
|
作者
Xiang Zeng
Tiesong Hu
Xuning Guo
Xinjie Li
机构
[1] Wuhan University,State Key Laboratory of Water Resources and Hydropower Engineering Science
[2] China Institute of Water Resources and Hydropower Research,Research Centre of Xiaolangdi
[3] Yellow River Institute of Hydraulic Research,undefined
来源
关键词
Inter-basin water transfer; Multi-reservoir operation rule; Water transfer rule; Water transfer triggering mechanism; Hedging rule curves; Improved particle swarm optimization algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
This paper proposes a new water transfer triggering mechanism for multi-reservoir system to divert water from abundant to scarce regions with a constant diversion flow in an inter-basin water transfer-supply project. Taking into account of the uncertain nature of inflow, the storage of reservoir is taken as a signal for decision-making to indicate water abundance or water scarcity. In this study, a set of rule curves based on storage of donor reservoir and storage of recipient reservoir are used together to determine when to start water transfer. To initiate water diversion to each recipient reservoir effectively, several water transfer rule curves of the donor reservoir are set for each recipient reservoir respectively in the multi-reservoir system with one donor reservoir and several recipient reservoirs, which is the main difference in comparison with other water transfer triggering mechanisms. In addition, a systematic framework is developed to integrate the water transfer rule curves with hedging rule curves to simultaneously solve the water transfer and water supply problems, since they interact with each other during the operation process. In order to verify the utility of the new water transfer triggering mechanism, an inter-basin water transfer-supply project in China is used as a case study and an improved particle swarm optimization algorithm (IPSO) with a simulation model is adopted for optimizing the decision variables. The results show that the proposed water transfer triggering mechanism can improve the operation performances of the inter-basin system.
引用
收藏
页码:1293 / 1308
页数:15
相关论文
共 50 条
  • [41] Inter-Basin Water Transfer Supply Chain Coordination with Ramsey Pricing
    Chen, Zhisong
    Cheung, Keith C. K.
    Tan, Manyi
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (19)
  • [42] INTER-BASIN WATER TRANSFER - ECOLOGICAL CONCERNS
    MEADOR, MR
    FISHERIES, 1992, 17 (02) : 17 - 22
  • [43] Impact of Climate Change on Water Transfer Scale of Inter-basin Water Diversion Project
    Bai, Tao
    Li, Lei
    Mu, Peng-fei
    Pan, Bao-zhu
    Liu, Jin
    WATER RESOURCES MANAGEMENT, 2023, 37 (6-7) : 2505 - 2525
  • [44] Impact of Climate Change on Water Transfer Scale of Inter-basin Water Diversion Project
    Tao Bai
    Lei Li
    Peng-fei Mu
    Bao-zhu Pan
    Jin Liu
    Water Resources Management, 2023, 37 : 2505 - 2525
  • [45] Determination of drought limit water level of importing reservoir in inter-basin water transfer project under changing environment
    Jiezhao Wu
    Fawen Li
    Yong Zhao
    Runxiang Cao
    Theoretical and Applied Climatology, 2019, 137 : 1529 - 1539
  • [46] Multi-Objective Optimal Operation of the Inter-Basin Water Transfer Project Considering the Unknown Shapes of Pareto Fronts
    Xu, Jianjian
    Bai, Dan
    WATER, 2019, 11 (12)
  • [47] Determination of drought limit water level of importing reservoir in inter-basin water transfer project under changing environment
    Wu, Jiezhao
    Li, Fawen
    Zhao, Yong
    Cao, Runxiang
    THEORETICAL AND APPLIED CLIMATOLOGY, 2019, 137 (1-2) : 1529 - 1539
  • [48] Water Transfer Energy Efficiency Index for inter-basin water transfer projects
    Yi, Sooyeon
    WATER AND ENVIRONMENT JOURNAL, 2024, 38 (03) : 535 - 547
  • [49] Multi-Objective Optimal Scheduling of Generalized Water Resources Based on an Inter-Basin Water Transfer Project
    Xi, Haichao
    Xie, Yangyang
    Liu, Saiyan
    Mao, Qing
    Shen, Teng
    Zhang, Qin
    WATER, 2023, 15 (18)
  • [50] The Influence and Function of Inter-basin Water Transfer Project in Alleviating Water Shortage of the Yellow River
    Chen Hongli
    Yang Libin
    Zhao Maihuan
    PROCEEDINGS OF THE 4TH INTERNATIONAL YELLOW RIVER FORUM ON ECOLOGICAL CIVILIZATION AND RIVER ETHICS, VOL II, 2010, : 441 - 447