Methods and Models of Project Resource Management under Uncertainty

被引:0
|
作者
O. A. Kosorukov
D. V. Lemtyuzhnikova
A. V. Mishchenko
机构
[1] Moscow State University,
[2] Trapeznikov Institute of Control Sciences,undefined
[3] Russian Academy of Sciences,undefined
[4] Moscow Aviation Institute (National Research University),undefined
[5] Leonov Technological University,undefined
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:304 / 322
页数:18
相关论文
共 50 条
  • [41] A hybrid projection method for resource-constrained project scheduling problem under uncertainty
    Aramesh, Saeed
    Aickelin, Uwe
    Khorshidi, Hadi Akbarzadeh
    NEURAL COMPUTING & APPLICATIONS, 2022, 34 (17): : 14557 - 14576
  • [42] Resource constrained multi-project scheduling modeling under certainty and uncertainty duration
    Hu, Wen-Bin
    Yue, Yu
    Xu, Long
    Wang, Kai-Kai
    Xia, Chang
    Du, Bo
    Song, Wei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2012, 18 (11): : 2398 - 2408
  • [43] Multi-project scheduling under uncertainty and resource flexibility: a systematic literature review
    Aghileh, Marzieh
    Tereso, Anabela
    Alvelos, Filipe
    Monteiro Lopes, Maria Odete
    PRODUCTION AND MANUFACTURING RESEARCH-AN OPEN ACCESS JOURNAL, 2024, 12 (01):
  • [44] Selected parallel optimization methods for financial management under uncertainty
    Pflug, GC
    Swietanowski, A
    PARALLEL COMPUTING, 2000, 26 (01) : 3 - 25
  • [45] A hybrid projection method for resource-constrained project scheduling problem under uncertainty
    Saeed Aramesh
    Uwe Aickelin
    Hadi Akbarzadeh Khorshidi
    Neural Computing and Applications, 2022, 34 : 14557 - 14576
  • [46] Robust population management under uncertainty for structured population models
    Deines, A.
    Peterson, E.
    Boeckner, D.
    Boyle, J.
    Keighley, A.
    Kogut, J.
    Lubben, J.
    Rebarber, R.
    Ryan, R.
    Tenhumberg, B.
    Townley, S.
    Tyre, A. J.
    ECOLOGICAL APPLICATIONS, 2007, 17 (08) : 2175 - 2183
  • [47] Investment in production resource flexibility: An empirical investigation of methods for planning under uncertainty
    Katok, E
    Tarantino, W
    Harrison, TP
    NAVAL RESEARCH LOGISTICS, 2003, 50 (02) : 105 - 129
  • [48] PROJECT MANAGEMENT - CONTROLLING UNCERTAINTY
    STAROPLI, GK
    JOURNAL OF SYSTEMS MANAGEMENT, 1975, 26 (05): : 28 - 29
  • [49] Approaches to uncertainty in project management
    Krejci, Igor
    Kvasnicka, Roman
    AGRARIAN PERSPECTIVES XVIII, VOLS 1 AND 2, 2009, : 405 - 408
  • [50] Dealing with uncertainty in ecosystem models: The paradox of use for living marine resource management
    Link, J. S.
    Ihde, T. F.
    Harvey, C. J.
    Gaichas, S. K.
    Field, J. C.
    Brodziak, J. K. T.
    Townsend, H. M.
    Peterman, R. M.
    PROGRESS IN OCEANOGRAPHY, 2012, 102 : 102 - 114