Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling

被引:18
|
作者
Tiwari S. [1 ]
Johari S. [1 ]
机构
[1] Department of Civil Engineering, Madhav Institute of Technology & Science Gwalior, Gwalior, Madhya Pradesh
关键词
Constrained resource scheduling; Critical path method; Linear programming; Microsoft project software;
D O I
10.1007/s40030-014-0099-2
中图分类号
学科分类号
摘要
Project managers today rely on scheduling tools based on project network techniques like Critical Path Method (CPM) to determine the overall project duration and the activities float time. Such data provide important information about the degree of flexibility with respect to the project schedule that leads to greater efficiency in planning and control of projects. The traditional representation of CPM, however, is based on two unrealistic assumptions: that the project deadline is not restricted and that resources are unlimited. In most of the construction projects the deadline and resource limits are practical constraints that need to be satisfied simultaneously. While the available literatures describe several techniques to resolve the Time Cost Trade off (TCT) and Constrained Resource Scheduling (CRS) individually, little effort has been devoted to consider them simultaneously because of the higher modeling complexity involved. No commercial software includes any TCT heuristic to help meet deadline, let alone any procedure to resolve both deadline and resource constraints. In practice on the other hand there is a need to formulate a method that simultaneously resolves to meet out the specified duration and resource constraints. This paper therefore introduces a two-step procedure where first the TCT is applied using Microsoft excel software to meet the project deadline assuming unlimited resources. The various feasible schedules obtained in the first step are then explored by applying CRS using Microsoft Project Software (MSP) to arrive at the desired project schedule meeting the deadline with available resources. The proposed approach was experimented on several case studies that proved its usefulness. The intertwined approach using simple and popular Microsoft office tools (Excel and MSP) is logical, fast and provides a set of feasible project schedule meeting the deadline and that do not violate resource limits. © 2014, The Institution of Engineers (India).
引用
收藏
页码:37 / 46
页数:9
相关论文
共 50 条
  • [21] Scheduling parallel CNC machines with time/cost trade-off considerations
    Gurel, Sinan
    Akturk, M. Selim
    COMPUTERS & OPERATIONS RESEARCH, 2007, 34 (09) : 2774 - 2789
  • [22] Project scheduling with time, cost and risk trade-off using adaptive multiple objective differential evolution
    Duc Hoc Tran
    Luong Duc Long
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (05) : 623 - 638
  • [23] The resource-constrained time/cost trade-offs project scheduling with discount cash flow
    Zhang, JW
    Xu, Y
    He, ZW
    PROCEEDINGS OF THE 2005 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING (12TH), VOLS 1- 3, 2005, : 2303 - 2307
  • [24] A Genetic Algorithm to Time- Cost Trade off in Project Scheduling
    Hooshyar, B.
    Rahmani, A.
    Shenasa, M.
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 3081 - +
  • [25] Time and cost trade-off heuristics for workflow scheduling based on bottom level
    Liu, Cancan
    Zhang, Weimin
    Luo, Zhigang
    Guofang Keji Daxue Xuebao/Journal of National University of Defense Technology, 2013, 35 (03): : 61 - 66
  • [26] Time and cost trade-off management for scheduling parallel applications on Utility Grids
    Garg, Saurabh Kumar
    Buyya, Rajkumar
    Siegel, Howard Jay
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF GRID COMPUTING-THEORY METHODS AND APPLICATIONS, 2010, 26 (08): : 1344 - 1355
  • [27] Developing an optimization financing cost-scheduling trade-off model in construction project
    Tavakolan, Mehdi
    Nikoukar, Shayan
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (02) : 262 - 277
  • [28] Robust scheduling and robustness measures for the discrete time/cost trade-off problem
    Hazir, Oencue
    Haouari, Mohamed
    Erel, Erdal
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2010, 207 (02) : 633 - 643
  • [29] Discrete time/cost trade-off project scheduling problem with tardiness bounds - an application to the Ministry of Health in Turkey
    Akbudak, Ozlem
    Karakaya, Gulsah
    Azizoglu, Meral
    EUROPEAN JOURNAL OF INDUSTRIAL ENGINEERING, 2025, 19 (02)
  • [30] Multi-mode Time-Cost-Robustness Trade-Off Project Scheduling Problem under Uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 302 - 306