Virtual pantograph-catenary environment for control development based on a co-simulation approach

被引:0
|
作者
P. Ramalho
P. Antunes
J. Ambrósio
A. M. Macedo
S. Pissarra
机构
[1] Universidade de Lisboa,IDMEC, Instituto Superior Técnico
[2] University of Huddersfield,IRR, Institute of Railway Research
[3] IP,undefined
[4] Infraestruturas de Portugal,undefined
来源
Multibody System Dynamics | 2022年 / 55卷
关键词
Multibody pantograph; Overhead contact line; Time integration; Interoperability; Time step coordination; Railway dynamics;
D O I
暂无
中图分类号
学科分类号
摘要
Multibody dynamics methodologies have the potential to integrate in a unique simulation environment the different disciplines, each one with its own equilibrium equations and computational methods. The key issue is not so much the ability to include the different modelling and solution methods in the same computer code, but much more the possibility to handle different codes, eventually programmed with different languages and using their own numerical methods, in a computational environment in which they exchange data in a controlled and efficient form. Such an environment in which different codes co-exist and have coordinated time stepping procedures is defined as a co-simulation. In this work, a co-simulation environment in which a multibody dynamics code is simulated concurrently with a finite element code is presented and demonstrated. The main goal behind this development is to develop a virtual scenario of a realistic interaction between train roof-mounted pantographs and the overhead contact line, also known as catenary, in which different paradigms for the development of mechatronic pantographs can be tested. The multibody code is the simulation tool for the multibody pantograph, while the finite element code is the computational tool in which the catenary is modelled and simulated. Each code has its own time integration algorithm, which require that the equations of motion of both multibody and finite element models are solved at different time instants. This paper proposes a coordination strategy for the time stepping and input-output data required by each of the time integrators that complete the co-simulation environment. The complete co-simulation methodology is demonstrated with the study of the interaction between pantographs and a catenary with the objectives of providing the realistic virtual test ground for the development of mechatronic pantographs and identifying the maximum operation velocity at which the pantograph-catenary couple can operate.
引用
收藏
页码:241 / 265
页数:24
相关论文
共 50 条
  • [41] Dynamical performance simulation of the pantograph-catenary coupled system based on direct integration method
    Zhou, Ning
    Zhang, Weihua
    2008, Chinese Academy of Railway Sciences (29):
  • [42] Study on Simulation Method of Pantograph-Catenary System Considering Ice Coating
    Yao, Yongming
    Zou, Dong
    Wang, Jiangwen
    Zhou, Ning
    Zhang, Weihua
    ADVANCES IN DYNAMICS OF VEHICLES ON ROADS AND TRACKS, IAVSD 2019, 2020, : 189 - 195
  • [43] A modal coordinate catenary model for the real-time simulation of the pantograph-catenary dynamic interaction
    Gregori, S.
    Tur, M.
    Pedrosa, A.
    Tarancon, J. E.
    Fuenmayor, F. J.
    FINITE ELEMENTS IN ANALYSIS AND DESIGN, 2019, 162 : 1 - 12
  • [44] Deep Learning Based Arc Detection in Pantograph-Catenary Systems
    Karaduman, Gulsah
    Karakose, Mehmet
    Akin, Erhan
    2017 10TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONICS ENGINEERING (ELECO), 2017, : 904 - 908
  • [45] A New Approach Based on Predictive Maintenance Using the Fuzzy Classifier in Pantograph-Catenary Systems
    Karaduman, Gulsah
    Akin, Erhan
    IEEE TRANSACTIONS ON INTELLIGENT TRANSPORTATION SYSTEMS, 2022, 23 (05) : 4236 - 4246
  • [46] Characteristic analysis of pantograph-catenary detachment arc based on double-pantograph-catenary dynamics in electrified railways
    Zhou, Hongyi
    Liu, Zhigang
    Xiong, Jiaming
    Duan, Fuchuan
    IET ELECTRICAL SYSTEMS IN TRANSPORTATION, 2022, 12 (04) : 238 - 250
  • [47] Study of Vehicle Pantograph-catenary dynamic performance Based on ADAMS
    Liu Nan
    Cui Tao
    Li Ming
    Wu Huichao
    PROCEEDINGS OF THE 35TH CHINESE CONTROL CONFERENCE 2016, 2016, : 10150 - 10155
  • [49] Cluster Analysis Based Arc Detection in Pantograph-Catenary System
    Huang, Shize
    Yu, Liangliang
    Zhang, Fan
    Zhu, Wei
    Guo, Qiyi
    JOURNAL OF ADVANCED TRANSPORTATION, 2018,
  • [50] Robust Adaptive Contact Force Control of Pantograph-Catenary System: An Accelerated Output Feedback Approach
    Song, Yongduan
    Li, Luyuan
    IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS, 2021, 68 (08) : 7391 - 7399