Experience with Construction of 500 kV Gas Insulated Switchgear at the Votkinsk Hydroelectric Power Plant

被引:0
|
作者
Deev A.P. [1 ]
机构
[1] Votkinsk HPP, branch of JSC RusHydro, Votkinsk
来源
Deev, A.P. | 1600年 / Springer Science and Business Media, LLC卷 / 51期
关键词
Electric power system protection - Controllers - Electric circuit breakers - Sulfur hexafluoride - Construction equipment - SF6 insulation - Electric substations - Electric switchgear - HVDC power transmission - Electric fields - Hydroelectric power;
D O I
10.1007/s10749-017-0776-1
中图分类号
学科分类号
摘要
The design documentation for reconstruction of the 500 kV outdoor distribution system was prepared for Votkinsk Hydroelectric Power Plant (HPP). The main structural and installation effort and the installation of power equipment and secondary switches took place from March 2013 through April 2014. Stepwise bringing of the new equipment into operation and removal of the of the existing equipment took place from April through October 2014. The reconstruction included construction of a building for the electrical apparatus for the GIS, together with the 500 kV relay cabinet, within which the equipment for the GIS, relay protection, emergency automation, automated electric power fiscal metering, automatic process controller, 380 V in house needs, and dc operational current panel. The Spanish firm Iberdrola, was responsible for the two-stage bargaining for completion of the design and development of working documentation, government review of the project, delivery of materials and equipment, construction-installation and adjustment work, and raising and matching of all questions with interested organizations. S.A.U. The obsolete equipment has been replaced by modern high-reliability indoor SF6 equipment. The location of the gas insulated switchgear building has made it possible to connect the apparatus to overhead transmission lines and transformer units using short outdoor SF6 current carriers instead of high-voltage cable inserts. The structural-installation work and comprehensive adjustment of the equipment are done without transfer of the existing 500 kV outdoor distribution equipment. The use of GIS equipment has substantially reduced the number of people in the areas with high electric fields during operational switching, repairing, and servicing of high-voltage equipment at the HPP.
引用
收藏
页码:20 / 22
页数:2
相关论文
共 50 条
  • [41] Very Fast Transients in a 500 kV Gas-Insulated Substation
    Xue, Haoyan
    Ametani, Akihiro
    Mahseredjian, Jean
    IEEE TRANSACTIONS ON POWER DELIVERY, 2019, 34 (02) : 627 - 637
  • [42] CONVERSION OF 230 KV SWITCHYARD TO GAS INSULATED SUBSTATION IN A GAS PLANT
    D'Souza, Merwyn
    Al Shammari, Saud
    Safwa, Mghwar
    2016 Petroleum and Chemical Industry Technical Conference (PCIC), 2016,
  • [43] DEVELOPMENT AND APPLICATION OF 500 kV GAS INSULATED TRANSMISSION LINES.
    Araki, Tomoo
    1600, (25):
  • [44] Maintenance Method Based on Risk Estimation for 170 kV Pneumatic Type Gas Insulated Switchgear
    Kim, Y. M.
    Jung, J. R.
    Kim, C. H.
    Jin, M. J.
    9th WCEAM Research Papers: Vol 1: Proceedings of 2014 World Congress on Engineering Asset Management, 2015, : 157 - 164
  • [45] An Elimination Method for an Emergency Situation in Gas-Insulated Switchgear in Power Grids
    Borecki, Michal
    Sobolewski, Konrad
    IEEE TRANSACTIONS ON POWER DELIVERY, 2021, 36 (06) : 3724 - 3732
  • [46] Partial Discharge Induced Electromagnetic Wave Propagation Characteristics in 70 kV Gas Insulated Switchgear
    Hafizhah, Zahrina
    Khayam, Umar
    2014 International Conference on Electrical Engineering and Computer Science (ICEECS), 2014, : 337 - 340
  • [47] Application of electronic secondary technologies to 1000kV gas-insulated switchgear and transformers
    Harada, E
    Nogiwa, H
    Maruyama, S
    Ogata, K
    Yamada, K
    Ogawa, K
    1999 IEEE TRANSMISSION AND DISTRIBUTION CONFERENCE, VOLS 1 & 2, 1999, : 509 - 516
  • [48] The Effect of Mechanical Wear on the Contact applied to 170kV Gas Insulated Switchgear(GIS)
    Han K.-S.
    Lee J.-G.
    Ju H.-J.
    King J.-W.
    Han, Ki-Sim (hankisun@Kepco.co.Kr), 1668, Korean Institute of Electrical Engineers (69): : 1668 - 1674
  • [49] Research on Lightning Over-Voltage in 1000kV Gas Insulated Switchgear Substation
    Zhang, Yu
    Xu, Wei
    Liu, Nian
    Zhang, Yunhong
    Hu, Jiefeng
    Zhu, Jianguo
    38TH ANNUAL CONFERENCE ON IEEE INDUSTRIAL ELECTRONICS SOCIETY (IECON 2012), 2012, : 6212 - 6217
  • [50] Life Cycle Assessment of a 132 kV Gas Insulated Switchgear substation using LCA methodology
    Palumberi, A. G.
    Rebolini, M.
    Bonci, P.
    Giorgi, A.
    Grasso, F.
    2018 AEIT INTERNATIONAL ANNUAL CONFERENCE, 2018,