Uncertainty Modelling in Software Development Projects (With Case Study)

被引:0
|
作者
Linet Özdamar
Ebru Alanya
机构
[1] Yeditepe University,Department of Systems Engineering
[2] Application Consultant,Industrial & Financial Systems, IFS Turkey
来源
关键词
software development projects; resource allocation; fuzzy logic; scheduling heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
A project scheduling model tailored specifically for software development projects is proposed in this study. The model incorporates uncertainties related to activity durations and network topology. The first type of uncertainty exists due to error-prone coding which might result in elongated task durations caused by validation and debugging sessions. Furthermore, in practice, macro-activities represent groups of sub-tasks in order to simplify the planning and monitoring of the project. Due to the aggregation, it is more difficult to be precise on the duration of a macro-activity.
引用
收藏
页码:157 / 178
页数:21
相关论文
共 50 条
  • [31] A Case Study of Knowledge Management Usage in Agile Software Projects
    Cabral, Anderson Yanzer
    Ribeiro, Marcelo Blois
    Lemke, Ana Paula
    Silva, Marcos Tadeu
    Cristal, Mauricio
    Franco, Cristiano
    ENTERPRISE INFORMATION SYSTEMS-BK, 2009, 24 : 627 - 638
  • [32] Uncertainty quantification for disaster modelling: flooding as a case study
    Raillani, Hajar
    Hammadi, Lamia
    El Ballouti, Abdessamad
    Barbu, Vlad Stefan
    De Cursi, Eduardo Souza
    STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2023, 37 (07) : 2803 - 2814
  • [33] Towards better software projects and contracts: Commitment specifications in software development projects
    Kontio, J
    Pitkanen, O
    Sulonen, R
    PROCEEDINGS OF THE 1998 INTERNATIONAL CONFERENCE ON SOFTWARE ENGINEERING, 1998, : 486 - 489
  • [34] A meta-model of software development project states behavioral study of software projects
    Akbar, Rehan
    Hassan, Mohd Fadzil
    Abdullah, Azrai
    JOURNAL OF SOFTWARE-EVOLUTION AND PROCESS, 2017, 29 (04)
  • [35] Managing Uncertainty in Organic Development Projects
    Mathiassen, Lars
    Pedersen, Keld
    COMMUNICATIONS OF THE ASSOCIATION FOR INFORMATION SYSTEMS, 2008, 23 : 483 - 500
  • [36] MODELLING OF ECONOMIC RISK AND UNCERTAINTY IN LARGE INFRASTRUCTURE PROJECTS
    Schjaer-Jacobsen, Hans
    COMPUTATIONAL INTELLIGENCE IN BUSINESS AND ECONOMICS, 2010, 3 : 473 - 480
  • [37] Modelling the uncertainty of cost and t me in highway projects
    Moghayedi, Alireza
    Windapo, Abimbola
    INFRASTRUCTURE ASSET MANAGEMENT, 2022, 9 (02) : 73 - 88
  • [38] The Role of Modelling in Business Software Development: Case Study of Teaching and Industrial Practice in Zrenjanin, Serbia
    Kazi, Ljubica
    29TH INTERNATIONAL CONFERENCE ON COMPUTER THEORY AND APPLICATIONS (ICCTA 2019), 2019, : 14 - 23
  • [39] Uncertainty Analysis of Geothermal Development Projects Using Exploratory System Dynamics Modelling and Analysis Method
    Hartono, Irwin Nathanael
    Setiawan, Andri D.
    Hidayatno, Akhmad
    Dewi, Marmelia P.
    INTERNATIONAL JOURNAL OF TECHNOLOGY, 2023, 14 (07) : 1537 - 1547
  • [40] Software Architecture Evaluation in Global Software Development Projects
    Salger, Frank
    ON THE MOVE TO MEANINGFUL INTERNET SYSTEMS: OTM 2009 WORKSHOPS, 2009, 5872 : 391 - 400