共 50 条
- [43] Constructed Wetlands for removal of Phosphorus from Domestic Wastewater-A Patent Review Sustainable Water Resources Management, 2022, 8
- [46] REMOVAL EFFICIENCY OF NITROGEN AND PHOSPHORUS IN INTEGRATED CONSTRUCTED LAKE-SIDE WETLANDS FRESENIUS ENVIRONMENTAL BULLETIN, 2011, 20 (10A): : 2756 - 2763
- [47] Iron ore or manganese ore filled constructed wetlands enhanced removal performance and changed removal process of nitrogen under sulfamethoxazole and trimethoprim stress Environmental Science and Pollution Research, 2022, 29 : 71766 - 71773
- [49] Calcium enhanced the simultaneous removal of fluoride and phosphorus in constructed wetlands by mediating coupled abiotic-biotic transformation mechanisms JOURNAL OF ENVIRONMENTAL CHEMICAL ENGINEERING, 2025, 13 (02):
- [50] Enhanced Benzofluoranthrene Removal in Surface Flow Constructed Wetlands with the Addition of Carbon ACS OMEGA, 2021, 6 (04): : 2865 - 2872