Optimal Design and Operation of a Hydropower Reservoir Plant Using a WEAP-Based Simulation–Optimization Approach

被引:1
|
作者
Amir Hatamkhani
Mojtaba Shourian
Ali Moridi
机构
[1] Shahid Beheshti University,Faculty of Civil, Water and Environmental Engineering, Technical and Engineering College
来源
关键词
Hydropower reservoir plant; Optimal design and operation; Maximum energy production; Minimum flood damage;
D O I
暂无
中图分类号
学科分类号
摘要
Optimal design and operation of a hydropower reservoir is a complex optimization problem in terms of formulation and solution. In this study, a simulation–optimization model is developed for simultaneous design and operation of hydropower dams. WEAP (Water Evaluation and Planning) as the water resources planning simulation software is coupled with the Invasive Weeds Optimization (IWO) as the optimization routine. The developed simulation–optimization model is used for the Bakhtiari Dam hydropower plant in west of Iran. Two objectives for solving the problem are to maximize the energy generation and minimize the flood damage at a downstream target point. Two types of problems are investigated. The first problem only considers the optimal design of the hydropower plan, in which the decision variables include the storage capacity, minimum operation storage of the reservoir and the installed capacity of the power plant while the releases from the reservoir are determined using a predefined operation policy. In the second problem, simultaneous design and operation of the hydropower reservoir is examined where in addition to the design variables, the reservoir releases are also optimized as the operational variables. According to the results, although considering flood damage does not have much effect on design variables, but significantly affects the operation variables. Results show that the optimization of the design variables has more impact on the benefit gained from the system comparing the operational ones. Also, the standard operating policy (SOP) is an optimal or near-optimal operational solution for hydropower generation.
引用
收藏
页码:1637 / 1652
页数:15
相关论文
共 50 条
  • [21] Using Cellular Automata Approach to Optimize the Hydropower Reservoir Operation of Folsom Dam
    Goharian, Erfan
    Azizipour, Mohammad
    Sandoval-Solis, Samuel
    Fogg, Graham
    WATER, 2021, 13 (13)
  • [22] Optimal Reservoir Operation for Hydropower Generation using Non-linear Programming Model
    Arunkumar R.
    Jothiprakash V.
    Journal of The Institution of Engineers (India): Series A, 2012, 93 (2) : 111 - 120
  • [23] Simulation of Multiple Hydropower Reservoir Operations Using System Dynamics Approach
    Teegavarapu, Ramesh S. V.
    Simonovic, Slobodan P.
    WATER RESOURCES MANAGEMENT, 2014, 28 (07) : 1937 - 1958
  • [24] Simulation of Multiple Hydropower Reservoir Operations Using System Dynamics Approach
    Ramesh S. V. Teegavarapu
    Slobodan P. Simonovic
    Water Resources Management, 2014, 28 : 1937 - 1958
  • [25] Data on optimization of the Karun-4 hydropower reservoir operation using evolutionary algorithms
    Akbarifard, Saeid
    Sharifi, Mohammad Reza
    Qaderi, Kourosh
    DATA IN BRIEF, 2020, 29
  • [26] A LSTM-based approximate dynamic programming method for hydropower reservoir operation optimization
    Feng, Zhong-kai
    Luo, Tao
    Niu, Wen-jing
    Yang, Tao
    Wang, Wen-chuan
    JOURNAL OF HYDROLOGY, 2023, 625
  • [27] Application of the Grasshopper Optimization Algorithm (GOA) to the Optimal Operation of Hydropower Reservoir Systems Under Climate Change
    Kobra Rahmati
    Parisa-Sadat Ashofteh
    Hugo A. Loáiciga
    Water Resources Management, 2021, 35 : 4325 - 4348
  • [28] Application of the Grasshopper Optimization Algorithm (GOA) to the Optimal Operation of Hydropower Reservoir Systems Under Climate Change
    Rahmati, Kobra
    Ashofteh, Parisa-Sadat
    Loaiciga, Hugo A.
    WATER RESOURCES MANAGEMENT, 2021, 35 (13) : 4325 - 4348
  • [29] A simulation - Optimization models for multi-reservoir hydropower systems design at watershed scale
    Hatamkhani, Amir
    Moridi, Ali
    Yazdi, Jafar
    RENEWABLE ENERGY, 2020, 149 : 253 - 263
  • [30] Optimal Operation of Hydropower Station Based on Improved Particle Swarm Optimization Algorithm
    Ma, Xin
    ADVANCED RESEARCH ON COMPUTER SCIENCE AND INFORMATION ENGINEERING, 2011, 153 : 226 - 231