首页
学术期刊
论文检测
AIGC检测
热点
更多
数据
Reduce chair time
被引:0
|
作者
:
机构
:
来源
:
British Dental Journal
|
2009年
/ 206卷
/ 10期
关键词
:
D O I
:
10.1038/sj.bdj.2009.460
中图分类号
:
学科分类号
:
摘要
:
引用
收藏
页码:546 / 546
相关论文
共 50 条
[41]
Recommendations for Vertical Transfer of a Postoperative Total Hip Replacement Patient (Bed to Chair, Chair to Toilet, Chair to Chair, or Car to Chair)
Gonzalez, Cynthia M.
论文数:
0
引用数:
0
h-index:
0
机构:
Weiss Mem Hosp, Natl Assoc Orthopaed Nurses, Chicago, IL USA
Weiss Mem Hosp, Natl Assoc Orthopaed Nurses, Chicago, IL USA
Gonzalez, Cynthia M.
Howe, Cynthia M.
论文数:
0
引用数:
0
h-index:
0
机构:
City Hosp, TCU, Martinsburg, WV USA
Weiss Mem Hosp, Natl Assoc Orthopaed Nurses, Chicago, IL USA
Howe, Cynthia M.
Waters, Thomas R.
论文数:
0
引用数:
0
h-index:
0
机构:
Weiss Mem Hosp, Natl Assoc Orthopaed Nurses, Chicago, IL USA
Waters, Thomas R.
Nelson, Audrey
论文数:
0
引用数:
0
h-index:
0
机构:
James A Haley VAMC, Patient Safety Ctr Inquiry, Tampa, FL USA
Weiss Mem Hosp, Natl Assoc Orthopaed Nurses, Chicago, IL USA
Nelson, Audrey
Hughes, Nancy
论文数:
0
引用数:
0
h-index:
0
机构:
Amer Nurses Assoc, Ctr Environm & Occupat Hlth, Silver Spring, MD USA
Weiss Mem Hosp, Natl Assoc Orthopaed Nurses, Chicago, IL USA
Hughes, Nancy
ORTHOPAEDIC NURSING,
2009,
28
(02)
: S13
-
S17
[42]
HOW TO REDUCE WASTE OF WORKING TIME
VOLGIN, AI
论文数:
0
引用数:
0
h-index:
0
VOLGIN, AI
SIDYAKIN, KN
论文数:
0
引用数:
0
h-index:
0
SIDYAKIN, KN
SOTSIOLOGICHESKIE ISSLEDOVANIYA,
1985,
(04):
: 41
-
47
[43]
REDUCE PROJECT-CYCLE TIME
BARLOG, R
论文数:
0
引用数:
0
h-index:
0
机构:
NO ILLINOIS UNIV, DE KALB, IL 60115 USA
BARLOG, R
GINN, D
论文数:
0
引用数:
0
h-index:
0
机构:
NO ILLINOIS UNIV, DE KALB, IL 60115 USA
GINN, D
CHEMICAL ENGINEERING,
1994,
101
(07)
: 133
-
+
[44]
Combined with Technology reduce Heating time
Bauer, Reinhard
论文数:
0
引用数:
0
h-index:
0
机构:
Technokom, Gmund, Austria
Technokom, Gmund, Austria
Bauer, Reinhard
KGK-KAUTSCHUK GUMMI KUNSTSTOFFE,
2011,
64
(09):
: 8
-
10
[45]
NOW IS NOT THE TIME TO REDUCE PARKING DIMENSIONS
HUNNICUTT, JM
论文数:
0
引用数:
0
h-index:
0
HUNNICUTT, JM
ITE JOURNAL-INSTITUTE OF TRANSPORTATION ENGINEERS,
1980,
50
(11):
: 19
-
20
[46]
Resin trains reduce batch time
不详
论文数:
0
引用数:
0
h-index:
0
不详
CHEMICAL PROCESSING,
2002,
65
(07):
: 48
-
48
[47]
Pumpable refractories reduce installation time
Steel Times,
1993,
221
(01):
[48]
Systematic Approaches to Reduce Time to Implementation
论文数:
引用数:
h-index:
机构:
Rankin, Nicole
ASIA-PACIFIC JOURNAL OF CLINICAL ONCOLOGY,
2017,
13
: 89
-
89
[49]
DuPont to reduce time for batch runs
不详
论文数:
0
引用数:
0
h-index:
0
不详
CHEMICAL ENGINEERING,
1998,
105
(13)
: 157
-
157
[50]
Book publishers reduce cycle time
IPA Bull.,
2006,
4
(28-31):
←
1
2
3
4
5
→