A Stochastic Programming Model for Service Scheduling with Uncertain Demand: an Application in Open-Access Clinic Scheduling

被引:0
|
作者
Fu Y. [1 ]
Banerjee A. [1 ]
机构
[1] Department of Industrial and Systems Engineering, Texas A&M University, College Station, TX
关键词
Cancellation; No-show; Punctuality; Service scheduling; Stochastic integer programming; Urgent scheduling;
D O I
10.1007/s43069-021-00089-6
中图分类号
学科分类号
摘要
This paper addressed a scheduling problem which handles urgent tasks along with existing schedules. The uncertainties in this problem come from random process of existing schedules and unknown upcoming urgent tasks. To deal with the uncertainties, this paper proposes a stochastic integer programming (SIP) based aggregated online scheduling method. The method is illustrated through a study case from the outpatient clinic block-wise scheduling system which is under a hybrid scheduling policy combining regular far-in-advance policy and the open-access policy. The COVID-19 pandemic brings more challenges for the healthcare system including the fluctuations of service time and increasing urgent requests which this paper is designed for. The schedule framework designed in the method is comprehensive to accommodate various uncertainties in the healthcare service system, such as: no-shows, cancellations and punctuality of patients as well as preference of patients over time slots and physicians. © 2021, The Author(s), under exclusive licence to Springer Nature Switzerland AG.
引用
收藏
相关论文
共 50 条
  • [41] A Programming Model for Application-defined Multipath TCP Scheduling
    Froemmgen, Alexander
    Rizk, Amr
    Erbshaeusser, Tobias
    Weller, Max
    Koldehofe, Boris
    Buchmann, Alejandro
    Steinmetz, Ralf
    PROCEEDINGS OF THE 2017 INTERNATIONAL MIDDLEWARE CONFERENCE (MIDDLEWARE'17), 2017, : 134 - 146
  • [42] Shift scheduling with fuzzy logic: an application with an integer programming model
    Sagnak, Muhittin
    Kazancoglu, Yigit
    4TH WORLD CONFERENCE ON BUSINESS, ECONOMICS AND MANAGEMENT (WCBEM-2015), 2015, 26 : 827 - 832
  • [43] Mixed Integer Linear Programming Model for Open Pit Mine Scheduling
    Aallaoui, S.
    Azzamouri, A.
    Tchernev, N.
    IFAC PAPERSONLINE, 2022, 55 (10): : 2276 - 2281
  • [44] Application of chance-constrained programming for stochastic group shop scheduling problem
    Ahmadizar, Fardin
    Ghazanfari, Mehdi
    Fatemi Ghomi, Seyyed Mohammad Taghi
    International Journal of Advanced Manufacturing Technology, 2009, 42 (3-4): : 321 - 334
  • [45] Application of chance-constrained programming for stochastic group shop scheduling problem
    Ahmadizar, Fardin
    Ghazanfari, Mehdi
    Ghomi, Seyyed Mohammad Taghi Fatemi
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 321 - 334
  • [46] Application of chance-constrained programming for stochastic group shop scheduling problem
    Fardin Ahmadizar
    Mehdi Ghazanfari
    Seyyed Mohammad Taghi Fatemi Ghomi
    The International Journal of Advanced Manufacturing Technology, 2009, 42 : 321 - 334
  • [47] An application of stochastic programming method for nurse scheduling problem in real word hospital
    Bagheri, Mohsen
    Devin, Ali Gholinejad
    Izanloo, Azra
    COMPUTERS & INDUSTRIAL ENGINEERING, 2016, 96 : 192 - 200
  • [48] Dynamic Task Scheduling in Remote Sensing Data Acquisition from Open-Access Data Using CloudSim
    Wang, Zhibao
    Bai, Lu
    Liu, Xiaogang
    Chen, Yuanlin
    Zhao, Man
    Tao, Jinhua
    APPLIED SCIENCES-BASEL, 2022, 12 (22):
  • [49] A multi-stage stochastic programming for lot-sizing and scheduling under demand uncertainty
    Hu, Zhengyang
    Hu, Guiping
    COMPUTERS & INDUSTRIAL ENGINEERING, 2018, 119 : 157 - 166
  • [50] A Stochastic Dynamic Programming model for scheduling of offshore petroleum fields with resource uncertainty
    Haugen, KK
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1996, 88 (01) : 88 - 100