Energy-efficient scheduling model and method for assembly blocking permutation flow-shop in industrial robotics field

被引:0
|
作者
Min Kong
Peng Wu
Yajing Zhang
Weizhong Wang
Muhammet Deveci
Seifedine Kadry
机构
[1] Anhui Normal University,School of Economics and Management
[2] Hefei University of Technology,School of Management
[3] Turkish Naval Academy,Department of Industrial Engineering
[4] National Defence University,The Bartlett School of Sustainable Construction
[5] University College London,Department of Electrical and Computer Engineering
[6] Lebanese American University,Department of Applied Data Science
[7] Noroff University College,Artificial Intelligence Research Center (AIRC)
[8] Ajman University,MEU Research Unit
[9] Middle East University,undefined
关键词
Efficient-energy scheduling; Industrial robotics; Production assembly; Heuristic algorithm; Meta-heuristic algorithm;
D O I
暂无
中图分类号
学科分类号
摘要
Implementing green and sustainable development strategies has become essential for industrial robot manufacturing companies to fulfill their societal obligations. By enhancing assembly efficiency and minimizing energy consumption in workshops, these enterprises can differentiate themselves in the fiercely competitive market landscape and ultimately bolster their financial gains. Consequently, this study focuses on examining the collaborative assembly challenges associated with three crucial parts: the body, electrical cabinet, and pipeline pack, within the industrial robot manufacturing process. Considering the energy consumption during both active and idle periods of the industrial robot workshop assembly system, this paper presents a multi-stage energy-efficient scheduling model to minimize the total energy consumption. Two classes of heuristic algorithms are proposed to address this model. Our contribution is the restructuring of the existing complex mathematical programming model, based on the structural properties of scheduling sub-problems across multiple stages. This reformation not only effectively reduces the variable scale and eliminates redundant constraints, but also enables the Gurobi solver to tackle large-scale problems. Extensive experimental results indicate that compared to traditional workshop experience, the constructed green scheduling model and algorithm can provide more precise guidance for the assembly process in the workshop. Regarding total energy consumption, the assembly plans obtained through our designed model and algorithm exhibit approximately 3% lower energy consumption than conventional workshop experience-based approaches.
引用
收藏
相关论文
共 50 条
  • [31] Energy-efficient scheduling of flexible flow shop of composite recycling
    Ying Liu
    Michael Farnsworth
    Ashutosh Tiwari
    The International Journal of Advanced Manufacturing Technology, 2018, 97 : 117 - 127
  • [32] Collaborative assembly factory in the distributed permutation flow-shop scheduling problem considering flexible assembly and fuzzy processing time
    Cheng, Long
    Wang, Lei
    Cai, Jingcao
    Hu, Kongfu
    Xiong, Yuan
    Xia, Qiangqiang
    ENGINEERING OPTIMIZATION, 2025,
  • [33] Energy-efficient scheduling of flexible flow shop of composite recycling
    Liu, Ying
    Farnsworth, Michael
    Tiwari, Ashutosh
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2018, 97 (1-4): : 117 - 127
  • [34] Energy-efficient flexible flow shop scheduling with worker flexibility
    Gong, Guiliang
    Chiong, Raymond
    Deng, Qianwang
    Han, Wenwu
    Zhang, Like
    Lin, Wenhui
    Li, Kexin
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 141 (141)
  • [35] Effective constructive heuristic and iterated greedy algorithm for distributed mixed blocking permutation flow-shop scheduling problem
    Shao, Zhongshi
    Shao, Weishi
    Pi, Dechang
    KNOWLEDGE-BASED SYSTEMS, 2021, 221
  • [36] A Hyperheuristic With Q-Learning for the Multiobjective Energy-Efficient Distributed Blocking Flow Shop Scheduling Problem
    Zhao, Fuqing
    Di, Shilu
    Wang, Ling
    IEEE TRANSACTIONS ON CYBERNETICS, 2023, 53 (05) : 3337 - 3350
  • [37] Sustainable distributed permutation flow-shop scheduling model based on a triple bottom line concept
    Fathollahi-Fard, Amir M.
    Woodward, Lyne
    Akhrif, Ouassima
    JOURNAL OF INDUSTRIAL INFORMATION INTEGRATION, 2021, 24
  • [38] Batch Energy Scheduling Problem with no-wait/blocking Constraints for the general Flow-shop Problem
    Ferretti, I.
    Zavanella, L. E.
    INTERNATIONAL CONFERENCE ON INDUSTRY 4.0 AND SMART MANUFACTURING (ISM 2019), 2020, 42 : 273 - 280
  • [40] An effective hyper heuristic-based memetic algorithm for the distributed assembly permutation flow-shop scheduling problem
    Song, Hong-Bo
    Yang, You-Hong
    Lin, Jian
    Ye, Jing-Xuan
    APPLIED SOFT COMPUTING, 2023, 135