共 50 条
- [31] THE TWO-STAGE ASSEMBLY FLOWSHOP SCHEDULING PROBLEM WITH SETUP TIMES PROCEEDINGS OF THE 38TH INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2008, : 2029 - 2035
- [33] A two-stage flow shop scheduling problem with transportation considerations 4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2015, 13 (04): : 381 - 402
- [36] Two-Stage Hybrid Flowshop Scheduling Problem with Waiting Time 2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 442 - 446
- [40] Two-stage ACO to solve the job shop scheduling problem PROGRESS IN PATTERN RECOGNITION, IMAGE ANALYSIS AND APPLICATIONS, PROCEEDINGS, 2007, 4756 : 447 - 456