Improving Evaluation Methods for Production Capacity and Life of Open Pit Diamond Mines

被引:0
|
作者
A. N. Akishev
I. V. Zyryanov
S. V. Kornilkov
V. D. Kantemirov
机构
[1] Republic of Sakha (Yakutia),Yakutniproalmaz Institute, ALROSA
[2] Russian Academy of Sciences,Institute of Mining, Ural Branch
来源
Journal of Mining Science | 2017年 / 53卷
关键词
Diamond deposit; open pit mine production output; production capacity; downward mining advance rate; investment efficiency; national standard;
D O I
暂无
中图分类号
学科分类号
摘要
The article reports basic design parameters of open pit mines of ALROSA, as well as criteria and factors that govern the choice of production capacity of an open pit diamond mine under conditions of permafrost. The analytical relations and tables to calculate open pit mine life are presented, and the influence of the rate of the downward advance of an open pit mine on its capacity is demonstrated. The authors formulate key provisions for a paragraph of the national standard of RF enabling systematization of approaches to optimization of open diamond mining parameters.
引用
收藏
页码:71 / 76
页数:5
相关论文
共 50 条
  • [41] Research on path planning methods for autonomous dump trucks in open-pit mines
    Huang, Jiade
    Liu, Yong
    Deng, Mukun
    Mei, Wenqing
    Meitan Kexue Jishu/Coal Science and Technology (Peking), 2024, 52 (08): : 182 - 191
  • [42] Capacity planning in open-pit mines under economies of scale and block sequence considerations
    Balci, M.
    Kumral, M.
    MINERAL ECONOMICS, 2025,
  • [43] Deep Neural Network Models for Improving Truck Productivity Prediction in Open-pit Mines
    Omer Faruk Ugurlu
    Chengkai Fan
    Bei Jiang
    Wei Victor Liu
    Mining, Metallurgy & Exploration, 2024, 41 : 619 - 636
  • [44] Deep Neural Network Models for Improving Truck Productivity Prediction in Open-pit Mines
    Ugurlu, Omer Faruk
    Fan, Chengkai
    Jiang, Bei
    Liu, Wei Victor
    MINING METALLURGY & EXPLORATION, 2024, 41 (02) : 619 - 636
  • [45] LONG TERM PRODUCTION SCHEDULING OF OPEN PIT MINES, A REVIEW OF OLD AND NEW ALGORITHMS
    Hosseini, Seyed Mohammad Ali
    Kakaie, Reza
    Ataei, Mohammad
    SGEM 2008: 8TH INTERNATIONAL SCIENTIFIC CONFERENCE, VOL I, CONFERENCE PROCEEDINGS: MODERN MANAGEMENT OF MINE PRODUCING GEOLOGY AND ENVIRONMENTAL PROTECTION, 2008, : 477 - 485
  • [46] Stochastic integer programming for optimising long term production schedules of open pit mines: methods, application and value of stochastic solutions
    Dimitrakopoulos, R.
    Ramazan, S.
    TRANSACTIONS OF THE INSTITUTIONS OF MINING AND METALLURGY SECTION A-MINING TECHNOLOGY, 2008, 117 (04): : 155 - 160
  • [47] Integrated Optimization of Production Scheduling and Haulage Route Planning in Open-Pit Mines
    Xu, Changyou
    Chen, Gang
    Lu, Huabo
    Zhang, Qiuxia
    Liu, Zhengke
    Bian, Jing
    MATHEMATICS, 2024, 12 (13)
  • [48] Production scheduling of open-pit mines using genetic algorithm: a case study
    Alipour, Aref
    Khodaiari, Ali Asghar
    Jafari, Ahmad
    Tavakkoli-Moghaddam, Reza
    INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE AND ENGINEERING MANAGEMENT, 2020, 15 (03) : 176 - 183
  • [49] Perspective of metaheuristic optimization methods in open pit production planning
    Sattarvand, Javad
    Niemann-Delius, Christian
    GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT, 2008, 24 (04): : 143 - 155
  • [50] Stochastic Modeling Approach for the Evaluation of Backbreak due to Blasting Operations in Open Pit Mines
    Sari, Mehmet
    Ghasemi, Ebrahim
    Ataei, Mohammad
    ROCK MECHANICS AND ROCK ENGINEERING, 2014, 47 (02) : 771 - 783