Incorporating enhanced service reliability of public transport in cost-benefit analyses

被引:18
|
作者
van Oort N. [1 ]
机构
[1] Goudappel Coffeng Mobility Consultants/Delft University of Technology, PO Box 5048, Delft
关键词
Cost benefit analysis; Service reliability; Tram line planning;
D O I
10.1007/s12469-016-0121-3
中图分类号
学科分类号
摘要
In this paper, we demonstrate how to calculate the passenger impacts of service unreliability. We show that passengers are affected by longer waiting times and the distribution of travel times. We present a framework to calculate these effects and to express them in monetary values. In the Netherlands and many other countries, service reliability is not explicitly incorporated in cost benefit analyses, although improved service reliability is often one of the main contributions of public transport projects. In an actual case, the replacement of a bus line by a tram line in Utrecht, in The Netherlands, we proved that our framework is valuable and can be applied into practice. By calculating the benefits of the improved service reliability of the proposed tram line, which were about 2/3 of all benefits, the cost benefit ratio was positive, which convinced the Dutch Minister of Infrastructure and Environment to support the project by €110 million. © 2016, The Author(s).
引用
收藏
页码:143 / 160
页数:17
相关论文
共 50 条
  • [41] COST-BENEFIT ANALYSIS AND THEORY OF PUBLIC FINANCE
    ARONSON, JR
    JOURNAL OF ECONOMIC LITERATURE, 1970, 8 (02) : 442 - 443
  • [42] Cost-benefit analysis of passenger transport terminals
    Pienaar, WJ
    Heyns, GJ
    URBAN TRANSPORT V: URBAN TRANSPORT AND THE ENVIRONMENT FOR THE 21ST CENTURY, 2000, 5 : 471 - 480
  • [43] COST-BENEFIT ANALYSIS AND THEORY OF PUBLIC FINANCE
    MUSGRAVE, RA
    JOURNAL OF ECONOMIC LITERATURE, 1969, 7 (03) : 797 - 806
  • [44] Cost-benefit analyses of developmental crime prevention programmes
    Koegl, Christopher J.
    Farrington, David P.
    Welsh, Brandon C.
    CRIMINAL BEHAVIOUR AND MENTAL HEALTH, 2023, 33 (02) : 106 - 115
  • [45] AGRIBUSSINESS PROJECTS ASSESSMENT USING COST-BENEFIT ANALYSES
    Filipovici, Alexandru
    Mnerie, Alin Vasile
    Badescu, Doina
    Bota, Mircea
    Maris, Simina
    Baesu, Viorica
    Slavici, Titus
    Ungureanu, Dragos
    AKTUALNI ZADACI MEHANIZACIJE POLJOPRIVREDE, 2014, 42 : 439 - 445
  • [46] A Simple Method to Include Uncertainties in Cost-Benefit Analyses
    Nicolet, Pierrick
    Jaboyedoff, Michel
    Levy, Sebastien
    ENGINEERING GEOLOGY FOR SOCIETY AND TERRITORY, VOL 2: LANDSLIDE PROCESSES, 2015, : 1763 - 1766
  • [47] Does uncertainty make cost-benefit analyses pointless?
    Asplund, Disa
    Eliasson, Jonas
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2016, 92 : 195 - 205
  • [48] WEAKNESSES, TRAPS, AND ABUSES IN COST-BENEFIT ANALYSES OF PROJECTS
    MARTIN, F
    REVUE CANADIENNE D ETUDES DU DEVELOPPEMENT-CANADIAN JOURNAL OF DEVELOPMENT STUDIES, 1991, 12 (01): : 89 - 105
  • [49] Cost-benefit analyses of sprinklers in nursing homes for elderly
    Jaldell, Henrik
    JOURNAL OF BENEFIT-COST ANALYSIS, 2013, 4 (02): : 209 - 235
  • [50] DECISION LEVELS - NEGLECTED FACTOR IN COST-BENEFIT ANALYSES
    GEPHART, WJ
    EDUCATIONAL TECHNOLOGY, 1971, 11 (09) : 60 - 61