Shop-floor scheduling at shipbuilding yards using the multiple intelligent agent system

被引:0
|
作者
HYUN SOO CHOI
KYU HO PARK
机构
[1] Korea Advanced Institute of Science and Technology,Computer Engineering Research Laboratory, Department of Electrical Engineering, Korea
来源
关键词
Distributed artificial intelligence; intelligent agent; transformation of algorithmic systems into agents; shop-floor scheduling at shipbuilding yard; search-space reduction;
D O I
暂无
中图分类号
学科分类号
摘要
The intelligent agent system has become a typical approach to research distributed artificial intelligence and distributed problem solving. However, despite its various technical advantages, the distribution and expansion of the intelligent agent system approach has been limited because existing methodologies rely on specialized applications and therefore require intensive investment to develop new systems. In an attempt to conquer these difficulties, a standardized methodology to construct intelligent agent systems is proposed. This approach deviates from current agent system approaches of repeatedly constructing new and customized expert systems. Specifically, it provides an economical method for developing intelligent agent systems by investigating the possibility of standardizing message communication protocols in linguistics speech-act theory and by supplementing traditional algorithmic systems with intelligent segments using, among others, expert system tools. To verify effectiveness, the shop-floor scheduling system of a large-scale shipbuilding yard has been redesigned, developed, and tested using this approach. This shop-floor scheduling system requires the scheduling of when and where to process block construction under various constraints. It is a difficult four-dimensional time and space allocation problem involving traditional NP-complete search spaces. The tested intelligent agent system proposes an innovative method for reducing the search space into three levels: the algorithm level, the agent intelligence level, and the level of cooperation among agents. It also provides methods for solving deadlock occurrence and non-uniformity problems resulting from parallel processing. Test results demonstrate applicability and economy, among other technical advantages.
引用
收藏
页码:505 / 515
页数:10
相关论文
共 50 条
  • [21] Agent-based information architecture for shop-floor control
    Viswanadham, N.
    Lakshminarayanan, A.
    Sadhana - Academy Proceedings in Engineering Sciences, 1998, 23 (pt 4): : 359 - 376
  • [22] An agent-based information architecture for shop-floor control
    Viswanadham, N
    Lakshminarayanan, A
    SADHANA-ACADEMY PROCEEDINGS IN ENGINEERING SCIENCES, 1998, 23 (4): : 359 - 376
  • [23] Distributed initiative and collaborative manufacturing: new paradigm for intelligent shop-floor
    Zhuang C.
    Liu J.
    Xiong H.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (08): : 1865 - 1874
  • [24] Collaborative Scheduling of Production and Transportation in the Shop-Floor Based on Digital Twin
    Xiong, Xiaozheng
    Xu, Wenjun
    Liu, Jiayi
    Hu, Yang
    2022 IEEE 17TH CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA), 2022, : 620 - 626
  • [25] Timing constraints' optimization of reserved tasks in the distributed shop-floor scheduling
    Lee, S
    Jung, MY
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2003, 41 (02) : 397 - 410
  • [26] A hybrid shop-floor control system for food manufacturing
    Moreno-Lizaranzu, MJ
    Wysk, RA
    Hong, J
    Prabhu, VV
    IIE TRANSACTIONS, 2001, 33 (03) : 193 - 202
  • [27] Agent-Based Shop Floor Scheduling
    Klima, Martin
    Gregor, Jan
    Harcuba, Ondrej
    Marik, Vladimir
    INDUSTRIAL APPLICATIONS OF HOLONIC AND MULTI-AGENT SYSTEMS, 2017, 10444 : 24 - 36
  • [28] ENCOURAGING ACADEMIC PRACTITIONER COLLABORATION - DEVELOPMENT OF AN INTELLIGENT DECENTRALIZED SHOP-FLOOR CONTROL-SYSTEM (LEITSTAND)
    SCHEER, AW
    IFIP TRANSACTIONS A-COMPUTER SCIENCE AND TECHNOLOGY, 1992, 14 : 333 - 333
  • [29] GPGP coordination mechanisms application in shop-floor scheduling systems based on MAS
    Zeng, Bo
    Yang, Jianjun
    Jixie Gongcheng Xuebao/Chinese Journal of Mechanical Engineering, 2001, 37 (08): : 80 - 83
  • [30] Interferometric measuring system for cone inspection on shop-floor level
    Gruebler, Till
    Drabarek, Pawel
    OPTICAL MEASUREMENT SYSTEMS FOR INDUSTRIAL INSPECTION IX, 2015, 9525