共 50 条
- [43] Outsourcing optimization in two-echelon supply chain network under integrated production-maintenance constraints Journal of Intelligent Manufacturing, 2019, 30 : 701 - 725
- [45] Effects analysis and reliability modeling of complex production systems Springer Series in Reliability Engineering, 2010, 25 : 219 - 312
- [47] Preemptive maintenance process scheduling under complex human resource constraints Kongzhi yu Juece/Control and Decision, 2022, 37 (02): : 393 - 400
- [48] Automation and parameters optimization in production line: a case of study INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2013, 66 (9-12): : 1315 - 1318
- [49] Optimization of offshore wind turbine operation and maintenance plan considering time window constraints Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2022, 43 (10): : 177 - 185
- [50] Automation and parameters optimization in production line: a case of study The International Journal of Advanced Manufacturing Technology, 2013, 66 : 1315 - 1318