The implementation of data reconciliation for evaluating a full-scale petrochemical wastewater treatment plant

被引:0
|
作者
Ali Behnami
Mohammad Shakerkhatibi
Reza Dehghanzadeh
Khaled Zoroufchi Benis
Siavash Derafshi
Esmaeil Fatehifar
机构
[1] Tabriz University of Medical Sciences,Department of Environmental Health Engineering, School of Health, Student Research Committee
[2] Tabriz University of Medical Sciences,Department of Environmental Health Engineering, School of Health
[3] Sahand University of Technology,Faculty of Chemical Engineering
[4] Tabriz petrochemical CO.,Office of Health Safety and Environment
关键词
Performance evaluation; Wastewater; Petrochemical; Activated sludge; Data reconciliation;
D O I
暂无
中图分类号
学科分类号
摘要
Data reconciliation and mass balance analysis were conducted for the first time to improve the data obtained from a petrochemical wastewater treatment plant (WWTP), and the results were applied to evaluate the performance of the plant. Daily average values for 209 days from the inlet and outlet of the plant obtained from WWTP documentation center along with the results of four sampling runs in this work were used for data reconciliation and performance evaluation of the plant. Results showed that standard deviation and relative errors in the balanced data of each measurement decreased, especially for the process wastewater from 24.5 to 8.6 % for flow and 24.5 to 1.5 % for chemical oxygen demand (COD). The errors of measured data were −137 m3/day (−4.41 %) and 281 kg/day (7.92 %) for flow and COD, respectively. According to the balanced data, the removal rates of COD and 5-day biological oxygen demand (BOD5) through the aeration unit were equal to 37 and 46 %, respectively. In addition, the COD and BOD5 concentrations were reduced by about 61.9 % (2137 kg/day) and 78.1 % (1976 kg/day), respectively, prior to the biological process. At the same time, the removal rates of benzene, toluene, and styrene were 56, 38, and 69 %, respectively. The results revealed that about 40 % of influent benzene (75.5 kg/day) is emitted to the ambient air at the overhead of the equalization basin. It can be concluded that the volatilization of organic compounds is the basic mechanism for the removal of volatile organic compounds (VOCs) and it corresponds to the main part of total COD removal from the WWTP.
引用
收藏
页码:22586 / 22595
页数:9
相关论文
共 50 条
  • [21] Integrating data reconciliation into material flow cost accounting: The case of a petrochemical wastewater treatment plant
    Behnami, Ali
    Benis, Khaled Zoroufchi
    Shakerkhatibi, Mohammad
    Fatehifar, Esmaeil
    Derafshi, Siavash
    Chavoshbashi, Mir Mohammad
    JOURNAL OF CLEANER PRODUCTION, 2019, 218 : 616 - 628
  • [22] Assessment of the Potential for Full-Scale Implementation of Mainstream Anaerobic Wastewater Treatment Scheme
    Bashar, Rania
    Karthikeyan, K. G.
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2017: WATER, WASTEWATER, AND STORMWATER; URBAN WATERSHED MANAGEMENT; AND MUNICIPAL WATER INFRASTRUCTURE, 2017, : 324 - 333
  • [23] Data evaluation of full-scale wastewater treatment plants by mass balance
    Puig, S.
    van Loosdrecht, M. C. M.
    Colprim, J.
    Meijer, S. C. F.
    WATER RESEARCH, 2008, 42 (18) : 4645 - 4655
  • [24] Effect of Chlorination on Microbiological Quality of Effluent of a Full-Scale Wastewater Treatment Plant
    Zerva, Ioanna
    Remmas, Nikolaos
    Kagalou, Ifigeneia
    Melidis, Paraschos
    Ariantsi, Marina
    Sylaios, Georgios
    Ntougias, Spyridon
    LIFE-BASEL, 2021, 11 (01): : 1 - 13
  • [25] Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal
    Zhou, Zhen
    Xing, Can
    Wu, Zhichao
    Tong, Fei
    Wang, Junru
    ENVIRONMENTAL TECHNOLOGY, 2014, 35 (06) : 766 - 772
  • [26] Full-scale sludge reduction in the water line of municipal wastewater treatment plant
    Di Iaconi C.
    De Sanctis M.
    Altieri V.G.
    Journal of Environmental Management, 2020, 269
  • [27] Long-term assessment of nitrification in a full-scale wastewater treatment plant
    Mertoglu, Bulent
    JOURNAL OF ENVIRONMENTAL SCIENCE AND HEALTH PART A-TOXIC/HAZARDOUS SUBSTANCES & ENVIRONMENTAL ENGINEERING, 2008, 43 (05): : 538 - 546
  • [28] Parallel hybrid modeling methods for a full-scale cokes wastewater treatment plant
    Lee, DS
    Vanrolleghem, PA
    Park, JM
    JOURNAL OF BIOTECHNOLOGY, 2005, 115 (03) : 317 - 328
  • [29] Full-scale sludge reduction in the water line of municipal wastewater treatment plant
    Di Iaconi, Claudio
    De Sanctis, Marco
    Altieri, Valerio Guido
    JOURNAL OF ENVIRONMENTAL MANAGEMENT, 2020, 269
  • [30] Biological Phosphorus Removal Characteristics in a Full-scale Unitank Wastewater Treatment Plant
    Zhou, Zhen
    Shao, Wenrui
    Xing, Can
    Li, Zheng
    Guan, Pengqiong
    Zhou, Tao
    Wei, Zichao
    PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING, PTS 1-4, 2013, 610-613 : 1696 - 1700