Constructive heuristics for the canister filling problem

被引:0
|
作者
Gašper Žerovnik
Janez Žerovnik
机构
[1] Jožef Stefan Institute,Reactor Physics Division
[2] Institute of Mathematics,Department of Mathematics
[3] Physics and Mechanics,University of Ljubljana
[4] Faculty of Mechanical Engineering,undefined
来源
Central European Journal of Operations Research | 2011年 / 19卷
关键词
Combinatorial optimization; Canister filling problem; Cardinality constrained bin packing; Spent nuclear fuel; Remove and reinsert heuristics;
D O I
暂无
中图分类号
学科分类号
摘要
The canister filling problem arises when optimizing the spent nuclear fuel repository in hard rock. It is shown the problem is NP-hard. Constructive heuristics followed by remove and reinsert local optimization are considered. Additionally, some theoretical insight on the algorithm operation is provided. Several variants of the algorithm are compared on random and realistic datasets. The obtained results have shown that constructive heuristics give satisfactory results for both random and realistic input data, although there is still some room for improvements.
引用
收藏
页码:371 / 389
页数:18
相关论文
共 50 条
  • [21] Evolving constructive heuristics for agile earth observing satellite scheduling problem with genetic programming
    Zhang, Feiyu
    Chen, Yuning
    Chen, Yingwu
    2018 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2018, : 493 - 499
  • [22] A Comparison of Constructive Heuristics with the Objective of Minimizing Makespan in the Flow-Shop Scheduling Problem
    Semanco, Pavol
    Modrak, Vladimir
    ACTA POLYTECHNICA HUNGARICA, 2012, 9 (05) : 177 - 190
  • [23] Combining Genetic Algorithm with Constructive and Refinement Heuristics for Solving the Capacitated Vehicle Routing Problem
    de Araujo Lima, Stanley Jefferson
    Rocha Santos, Renato Alessandro
    de Araujo, Sidnei Alves
    Triguis Schimit, Pedro Henrique
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: INITIATIVES FOR A SUSTAINABLE WORLD, 2016, 488 : 113 - 121
  • [24] Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem
    Shao, Weishi
    Shao, Zhongshi
    Pi, Dechang
    COMPUTERS & OPERATIONS RESEARCH, 2021, 136
  • [25] Agent-based Self-organized Constructive Heuristics for Travelling Salesman Problem
    Lu, Sai
    Xin, Bin
    Zhang, Hao
    Chen, Jie
    2020 59TH IEEE CONFERENCE ON DECISION AND CONTROL (CDC), 2020, : 1164 - 1169
  • [26] Evaluating the performance of constructive heuristics for the blocking flow shop scheduling problem with setup times
    Takano, Mauricio Iwama
    Nagano, Marcelo Seido
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING COMPUTATIONS, 2019, 10 (01) : 37 - 50
  • [27] A Neural Approach to Generation of Constructive Heuristics
    Alissa, Mohamad
    Sim, Kevin
    Hart, Emma
    2021 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC 2021), 2021, : 1147 - 1154
  • [28] A Constructive Heuristics and an Iterated Neighborhood Search Procedure to Solve the Cost-Balanced Path Problem
    Ambrosino, Daniela
    Cerrone, Carmine
    Sciomachen, Anna
    ALGORITHMS, 2022, 15 (10)
  • [29] Constructive heuristics for the Mixed Capacity Arc Routing Problem under Time Restrictions with Intermediate Facilities
    Willemse, Elias J.
    Joubert, Johan W.
    COMPUTERS & OPERATIONS RESEARCH, 2016, 68 : 30 - 62
  • [30] Ant-Based Generation Constructive Hyper-heuristics for the Movie Scene Scheduling Problem
    Singh, Emilio
    Pillay, Nelishia
    THEORY AND PRACTICE OF NATURAL COMPUTING (TPNC 2021), 2021, 13082 : 109 - 120