共 50 条
- [43] A Hybrid Metaheuristic Algorithm for Flexible Job-Shop Scheduling Problems with Transportation Constraints PROCEEDINGS OF THE FOURTEENTH INTERNATIONAL CONFERENCE ON GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 2012, : 441 - 448
- [44] A Hybrid Method for the Multi-Mode Resource-Constrained Project Scheduling Problem with Strip Packing like Resource Constraints PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
- [45] A Hybrid Method for the Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and Strip Packing like Resource Constraints PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON ENGINEERING COMPUTATIONAL TECHNOLOGY, 2010, 94
- [47] A hybrid iterated local search metaheuristic for the flexible job shop scheduling problem 2018 XLIV LATIN AMERICAN COMPUTER CONFERENCE (CLEI 2018), 2018, : 149 - 157
- [49] A new method coupling simulation and a hybrid metaheuristic to solve a multiobjective hybrid flowshop scheduling problem PROCEEDINGS OF THE 7TH CONFERENCE OF THE EUROPEAN SOCIETY FOR FUZZY LOGIC AND TECHNOLOGY (EUSFLAT-2011) AND LFA-2011, 2011, : 1082 - 1089