共 50 条
- [42] Long-term monitoring technology of beijing-shanghai high-speed railway elevated station track system J. Railw. Eng. Soc., 5 (35-41):
- [43] Synthetical Benefit Evaluation of High-Speed Rail, Take Beijing-Shanghai High-Speed Rail for Example LTLGB 2012: PROCEEDINGS OF INTERNATIONAL CONFERENCE ON LOW-CARBON TRANSPORTATION AND LOGISTICS, AND GREEN BUILDINGS. VOL 1, 2013, : 395 - 402
- [46] TECHNOLOGIES OF CONSTRUCTION AND SETTLEMENT CONTROL FOR TRANSITION SECTION BETWEEN SUBGRADE AND CULVERT IN BEIJING-SHANGHAI HIGH-SPEED RAILWAY CONSTRUCTION AND MAINTENANCE OF RAILWAY INFRASTRUCTURE IN COMPLEX ENVIRONMENT, 2014, : 305 - 310
- [47] In-situ test on settlement of CFG pile-raft composite foundation in high-speed railway Dongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Southeast University (Natural Science Edition), 2010, 40 (03): : 570 - 574
- [48] STUDY ON THE INFLUENCE ON DEWATERING INDUCED SETTLEMENT OF CFG PILE COMPOSITE FOUNDATION IN HIGH-SPEED RAILWAY STATION NEW TECHNOLOGIES OF RAILWAY ENGINEERING, 2012, : 501 - 504
- [49] Analytical Solution and Consolidation Features of CFG Pile-Raft Composite Foundation for High-Speed Railway Zhongguo Tiedao Kexue/China Railway Science, 2021, 42 (01): : 1 - 8
- [50] Analysis of Economic Development of Jinan West Area Influenced by Jinan Western Station of Beijing-Shanghai High-Speed Railway PROCEEDINGS OF THE THIRD INTERNATIONAL SYMPOSIUM ON REGIONAL MANAGEMENT SCIENCE AND ENGINEERING, 2011, : 307 - 311