Development of Risk-Based Bridge Maintenance Prioritization Methodology

被引:1
|
作者
Dongjin Kim
Yongjun Lee
Min-jae Lee
机构
[1] Chungnam National University,Dept. of Civil Engineering
来源
关键词
bridge; risk; maintenance; prioritization methodology; risk evaluation;
D O I
暂无
中图分类号
学科分类号
摘要
Collapse or breakage of a bridge generally causes considerable damage and social loss to the users. Therefore, it is critical to maintain a certain level of bridge performance. In addition, regular maintenance work should be performed for key bridges and countermeasures should be rapidly taken if a bridge is found to have a problem. As many of the bridges in South Korea have been publicly used for many years and are aged, the maintenance cost is expected to increase significantly. The government and relevant administrative authorities need a method to efficiently distribute limited budgetary resources and reasonably determine the maintenance priorities. The present study developed a risk-based maintenance prioritization methodology by identifying 14 general risk factors causing damage to bridges and the assessment criteria and weight for the risk factors were determined by conducting a literature review and expert consultation. A general-purpose risk-based prioritization model is presented using an Excel sheet to support user convenience. The model of the present study was developed to compensate the conventional maintenance prioritization method used by management authorities. The present model may be used for more reasonable bridge maintenance prioritization in combination with the conventional method.
引用
收藏
页码:3718 / 3725
页数:7
相关论文
共 50 条
  • [31] A risk-based methodology for modeling, assessing, and managing risks to the Hampton roads bridge tunnels
    Anderson, CW
    Courain, DJ
    Edmonds, PA
    Gouldey, AC
    Ward, NT
    PROCEEDINGS OF THE 2005 IEEE SYSTEMS & INFORMATION ENGINEERING DESIGN SYMPOSIUM, 2005, : 34 - 39
  • [32] Risk-based maintenance in power plants
    Risikobasierte Instandhaltung in Kraftwerken
    Hofmann, J., 2001, VGB-Kraftwerkstechnik GmbH, Essen, Germany (81):
  • [33] Risk-based maintenance - A new solution for problems in maintenance?
    Kahlert, J.
    VGB PowerTech, 2002, 82 (11):
  • [34] Risk-based maintenance - Techniques and applications
    Arunraj, N. S.
    Maiti, J.
    JOURNAL OF HAZARDOUS MATERIALS, 2007, 142 (03) : 653 - 661
  • [35] DEVELOPMENT OF THE RISK-BASED MAINTENANCE OPTIMIZATION SYSTEM FOR FOSSIL POWER PLANTS
    D.Watanabe
    Y.Chuman
    N.Nishimura
    H.Matsumoto
    K.Tominaga
    F.Sakata
    T.Kuroishi
    Acta Metallurgica Sinica(English Letters), 2004, (04) : 381 - 386
  • [36] Development of the risk-based maintenance optimization system for fossil power plants
    Watanabe, D.
    Chuman, Y.
    Nishimura, N.
    Matsumoto, H.
    Tominaga, K.
    Sakata, F.
    Kuroishi, T.
    Acta Metallurgica Sinica (English Letters), 2004, 17 (04) : 381 - 386
  • [37] A risk-based methodology for combating terrorism
    Florentine, C
    Isenstein, M
    Libet, J
    Neece, S
    Zeng, J
    Haimes, Y
    Horowitz, B
    2003 IEEE SYSTEMS & INFORMATION ENGINEERING DESIGN SYMPOSIUM, 2003, : 157 - 165
  • [38] A risk-based sensor placement methodology
    Lee, Ronald W.
    Kulesz, James J.
    JOURNAL OF HAZARDOUS MATERIALS, 2008, 158 (2-3) : 417 - 429
  • [39] Dynamic risk-based inspection methodology
    Bhatia, Karan
    Khan, Faisal
    Patel, Hiralben
    Abbassi, Rouzbeh
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2019, 62
  • [40] Development and Use of the Risk-Based Joint Integrity (RBJI) Assessment Methodology
    Brown, Warren
    ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2015, VOL 3, 2015,