Reinforcement Analysis of Toe Blocks and Anchor Cables at the Xiluodu Super-High Arch Dam

被引:0
|
作者
Jie Shi
Peng Lin
Yuande Zhou
Pengcheng Wei
Renkun Wang
机构
[1] Tsinghua University,State Key Laboratory of Hydroscience and Engineering
[2] Tsinghua University,Department of Hydraulic Engineering
[3] PowerChina,Chengdu Engineering Corporation Limited
来源
Rock Mechanics and Rock Engineering | 2018年 / 51卷
关键词
Xiluodu super-high arch dam; Reinforcement effect; Toe block; Anchor cable;
D O I
暂无
中图分类号
学科分类号
摘要
High stress concentrations near an arch dam–foundation interface may cause cracking and failure, particularly in super-high arch dams. Appropriate reinforcement measures are usually needed at the dam toe to increase the shear strength and bearing capacity of the rock mass foundation. In this paper, the criteria and procedure for reinforcement design of dam toe are first given, as priority issues in the overall safety assessment of super-high arch dams. A complete reinforcement analysis method covering the calculation of reinforcement force, effect evaluation and monitoring validation is proposed. With the Xiluodu super-high arch dam as an example, the reinforcement analysis under the numerical simulation and physical model tests performed are described in detail. The results show that the reinforcement measures adopted, such as the toe block and pre-stressed anchor cables, contribute to decrease the local high stresses at the dam toe, as well as increase the cracking initiation factor and the overall safety factor of the dam–foundation system. The reinforcement force loss of anchor cables during the subsequent construction stage has a limited effect on the dam performance. In terms of improving the stability at dam toe, the reinforcement of anchor cables is suggested to be implemented as early as possible. The reinforced dam is finally verified by field monitoring during the operation period. No anomalies in deformation, stress and seepage response near the dam are identified, and the arch dam is shown to perform as desired.
引用
收藏
页码:2533 / 2554
页数:21
相关论文
共 50 条
  • [41] Effect of the impounding process on the overall stability of a high arch dam: a case study of the Xiluodu dam, China
    Danni Luo
    Peng Lin
    Qingbin Li
    Dong Zheng
    Hongyuan Liu
    Arabian Journal of Geosciences, 2015, 8 : 9023 - 9041
  • [42] Simulation Feedback of Temperature Field of Super-High Arch Dam during Operation and Its Difference with Design Temperature
    Hou, Chunyao
    Chai, Dong
    Cheng, Heng
    Ning, Shaoqing
    Yang, Bo
    Zhou, Yi
    WATER, 2022, 14 (24)
  • [43] Analysis of cracking mechanism of concrete galleries in a super high arch dam
    Wei, Pengcheng
    Lin, Peng
    Peng, Haoyang
    Yang, Zongli
    Qiao, Yu
    ENGINEERING STRUCTURES, 2021, 248
  • [44] ROCK MASS RELAXATION MECHANISM AND REINFORCEMENT METHOD OF FOUNDATION EXCAVATION OF SUPER HIGH ARCH DAM
    Lin, Peng
    Li, Zi-Cang
    Jin, Jin-Xie
    Yang, Qiang
    Zhou, Wei-Yuan
    CONTROLLING SEISMIC HAZARD AND SUSTAINABLE DEVELOPMENT OF DEEP MINES: 7TH INTERNATIONAL SYMPOSIUM ON ROCKBURST AND SEISMICITY IN MINES (RASIM7), VOL 1 AND 2, 2009, : 229 - 234
  • [45] An approach for deformation modulus mechanism of super-high arch dams
    Wu, Bangbin
    Niu, Jingtai
    Su, Huaizhi
    Yang, Meng
    Wu, Zhongru
    Cui, Xinbo
    STRUCTURAL ENGINEERING AND MECHANICS, 2019, 69 (05) : 557 - 566
  • [46] Actual Working Performance Assessment of Super-High Arch Dams
    Liu, Yi
    Zhang, Guoxin
    Zhu, Bofang
    Shang, Feng
    JOURNAL OF PERFORMANCE OF CONSTRUCTED FACILITIES, 2016, 30 (02)
  • [47] Overall Stability Analysis of Xiluodu High Arch Dam Based on Fine Three-Dimension Numerical Modeling
    Ma, Tianhui
    Feng, Zhiqiang
    Tang, Chun'an
    Lin, Peng
    Yadav, Kedar Prasad
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [48] Intelligent concrete transport methods for super-high arch dams
    Xu J.
    Chen W.
    Tan Y.
    Gao S.
    Zhou T.
    Zhou M.
    Liu C.
    Liang C.
    Li X.
    1600, Tsinghua University (61): : 768 - 776
  • [49] Interval prediction method for dynamic zoning of displacements in super-high arch dam under significant water level fluctuations
    Xu, Bo
    Chen, Zeyuan
    Su, Huaizhi
    Zhang, Hu
    Zhu, Zhenhao
    STRUCTURAL HEALTH MONITORING-AN INTERNATIONAL JOURNAL, 2024,
  • [50] Discusion for standard and measure of temperature controlling in super-high arch dams